Laserfiche WebLink
Bowie No. 2 Mine C 1996083 Technical Revision No.77 Page 14 of 34 <br />Task description: <br />Site: Bowie No. 2 Mine <br />TRUCK/LOADER TEAM WORK <br />Haul Cover Material from Borrow Area #1 to Gob Pile #2 <br />PROJECT IDENTIFICATION <br />Permit Action: Technical Revision 77 Permit/Job #: C1996083 <br />Task #: 45B State: Colorado <br />Date: 4/30/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team - Truck: I Generic 10 -12 cy, 6x4 <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C083 -45B <br />Shift basis: I per day <br />Cost Breakdown: Truck/Loader Team Sunnort F.auinment Maintenance F.ouinment <br />Total work team cost/hour: $179.06 <br />MATERIAL OUANTITIES <br />Initial volume: 7,200 CCY <br />Loose volume: 8,388 LCY <br />Source of estimated volume: Volume IX, A <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.165 <br />0 <br />HOURLY PRODUCTION <br />Truck Cauacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.21 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />100 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$12.02 <br />$24.98 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$63.21 <br />$43.03 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$35.82 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$75.23 <br />$103.83 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $179.06 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $179.06 <br />MATERIAL OUANTITIES <br />Initial volume: 7,200 CCY <br />Loose volume: 8,388 LCY <br />Source of estimated volume: Volume IX, A <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />Swell factor: 1.165 <br />0 <br />HOURLY PRODUCTION <br />Truck Cauacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,900 Pounds /LCY <br />Description: Decomposed rock - 50% Rock, 50% Earth <br />Rated Payload: 35,400 Pounds <br />Payload Capacity: 12.21 LCY <br />CIRCES Cost Estimating Software <br />