My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-27_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-05-27_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:13 PM
Creation date
5/30/2014 11:03:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/27/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 2 Mine C1996083 Technical Revision No.77 <br />BULLDOZER WORK <br />Task description: Distribute Gob Pile #2 cover hauled by T/L <br />Site: Bowie No. 2 Mine <br />Permit Action: Technical Revision 77 <br />PROJECT IDENTIFICATION <br />Task #: 45A State: <br />Date: 4/29/2014 County: <br />User: SLB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EQU <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />IPMENT COST <br />Cat D10T - IOSU <br />574 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Page 12 of 34 <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -45a <br />Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $319.93 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost/Hour: <br />$99.15 <br />NA <br />Operating Cost/Hour: <br />$183.36 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: $319.93 <br />Total Fleet Cost/Hour: $319.93 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />134,142 <br />Swell factor: <br />1.000 <br />Loose volume: <br />134,142 LCY <br />Source of estimated volume: Volume IX, Appendix A <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />250 feet <br />754.3 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />6,300 feet <br />2,9001bs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.