My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-27_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-05-27_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:13 PM
Creation date
5/30/2014 11:03:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/27/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
388
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Cost Summary MR -151 <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Minor Revision <br />151 <br />Task #: OOL State: Colorado <br />Date: 5/19/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Pagel of 5 <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -OOL <br />Task <br />Description <br />Form Fleet "Task <br />Used Size Hours <br />Cost <br />111 <br />I I (' <br />150 <br />Replace Topsoil from Stockpile A to Truck <br />Loadout/Coal Stk I <br />SCRAPERI <br />1 <br />1 <br />1 <br />44.21 <br />$25,971.43 <br />($22,263.01) <br />$1,322.38 <br />Credit for Previous Task 111 <br />NA <br />-39.98 <br />Drill Seed Mix 3 on Disturbed Area <br />REVEGE <br />4.00 <br />SUBTOTALS: <br />8.23 <br />$5,030.80 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 hrs <br />Profit: <br />10.00% <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 4.00% <br />Reclamation management and /or administration: 3.13% <br />CONTINGENCY: 0.00 <br />$101.62 <br />$52.82 <br />$0.00 <br />$503.08 <br />$657.52 <br />$5,688.32 <br />Total = 0.00 <br />Total = $227.53 <br />$178.04 <br />Total = $0.00 <br />TOTAL INDIRECT COST= $1,063.10 <br />TOTAL BOND AMOUNT (direct + indirect) = $6,093.90 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.