My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-30_INSPECTION - C1981028
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981028
>
2014-05-30_INSPECTION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:19 PM
Creation date
5/30/2014 9:23:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
Inspection
Doc Date
5/30/2014
Doc Name
Inspection Report
From
DRMS
To
Coors Energy Company
Inspection Date
5/29/2014
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 29, 2014 C- 1981 - 028 /Keenesburg Strip Mine JLE <br />Vegetative Cover; Timing: <br />Reclamation parcels 32, 31, 30, 23, 33 and 25 were observed. Parcels 32 and 33 have sparse vegetation <br />established, some annual vegetation has begun to germinate in these areas. Cheatgrass was prevalent in all of the <br />reclamation parcels. In areas were the pre- emergent herbicide was used, the cheatgrass appeared stunted. <br />Perennial grasses observed consisted of sand dropseed, western wheatgrass, sand bluestem, blue grama and <br />various others. <br />A large patch of prickly lettuce was observed at the transition point between Parcels 31 and 30. <br />TOPSOIL — Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br />Topsand piles A -3, A -1 and B -1 were vegetated and appeared stable. Topsoil identification signs were in place. <br />Piles B -1 and A -1 have recent signs of excavation at the southern end of the pile where the Operator takes material <br />for the reclamation occurring in the B -Pit area. The recently disturbed portions of piles B -1 and A -1 were graded <br />and appeared stable. <br />Topsand has been placed in a lift at the southern end of B -Pit; additional material will need to be placed in order to <br />meet the required replacement depth in this area. Mr. Kipp indicated additional material will be placed in this area <br />in the future. <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.