Laserfiche WebLink
Task description: Summary for TR -77 <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />Permit Action: Technical <br />Revision 77 Permit/Job #: C1996083 <br />Task #: OOJ State: Colorado <br />Date: 05/05/2014 County: Delta <br />User: SLB <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C083 -OOJ <br />Task <br />Description <br />Form Fleet <br />Used Size <br />Task <br />Hours <br />Cost <br />042 <br />043 <br />044 <br />045 <br />046 <br />093 <br />123 <br />124 <br />125 <br />23R <br />24R <br />25R <br />42R <br />43R <br />44R <br />45a <br />45B <br />45C <br />45D <br />45e <br />45R <br />46R <br />93R <br />Haul Topsoil from Stockpile Area to Gob Pile #1 <br />SCRAPERI <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />2.18 <br />$1,216.22 <br />$8,800.72 <br />$96,751.64 <br />$95,377.30 <br />$96,042.74 <br />$6,921.00 <br />$38,044.99 <br />$3,598.32 <br />$42,278.94 <br />($16,047.92) <br />($38,528.45) <br />($73,884.88) <br />($8,124.49) <br />($48,317.67) <br />($57,257.50) <br />$120,057.27 <br />$8,958.53 <br />$40,983.15 <br />$7,439.85 <br />$44,049.55 <br />($238,906.47) <br />($56,244.80) <br />($2,238.00) <br />Place 3.5' of Coverfill on Gob Pile #1 <br />SCRAPERI <br />15.80 <br />Place Coverfill from Stockpiles on Gob Pile #2 <br />SCRAPERI <br />173.74 <br />Haul Cover Material from Gob Pile #3 to Gob Pile <br />#2 <br />TRUCKI <br />235.64 <br />Place 3.5' of Coverfill on Gob Pile #3, from <br />stockpile <br />SCRAPERI <br />172.47 <br />Finish Grade Gob Piles #1, #2, #3, and #4 <br />GRADER <br />50.64 <br />Replace topsoil from Stockpile E to Gob Pile #2 <br />SCRAPERI <br />68.32 <br />Replace Topsoil from Stockpile to Gob Pile #4 <br />SCRAPERI <br />6.46 <br />Replace topsoil from stockpile to Gob Pile #3 <br />SCRAPERI <br />75.92 <br />Credit for previous Task 123 amount <br />NA <br />-28.82 <br />Credit for previous Task 124 amount <br />NA <br />-69.19 <br />Credit for previous Task 125 amount <br />NA <br />- 132.68 <br />Credit for previous Task 042 amount <br />NA <br />-14.26 <br />Credit for previous Task 043 amount <br />NA <br />-86.77 <br />Credit for previous Task 044 amount <br />NA <br />- 102.82 <br />Distribute Gob Pile #2 cover hauled by T/L <br />DOZER <br />375.26 <br />Haul Cover Material from Borrow Area #1 to Gob <br />Pile #2 <br />TRUCKI <br />50.03 <br />Haul Cover Material from Borrow Area #2 to Gob <br />Pile #2 <br />TRUCKI <br />228.88 <br />Haul Cover Material from Borrow Area #3 to Gob <br />Pile #2 <br />TRUCKI <br />41.55 <br />Haul Cover Material from B Portal Storage to Gob <br />Pile #2 <br />TRUCKI <br />108.83 <br />Credit for previous Task 045 amount <br />NA <br />- 429.02 <br />Credit for previous Task 046 amount <br />NA <br />- 101.00 <br />Credit for previous Task 093 amount <br />NA <br />-16.38 <br />SUBTOTALS: <br />624.78 <br />$70,970.04 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Performance bond: 1.05% <br />Total = $1,433.59 <br />Total = $745.19 <br />