Laserfiche WebLink
May 21, 2014 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />Number of Partial Inspection this Fiscal Year: 18 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 16 of 20 <br />Pond F <br />Northeastern drying area <br />of Gob Pile #3. Material <br />is being turned over and <br />rehandled for drying. <br />