Laserfiche WebLink
May 21, 2014 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />Number of Partial Inspection this Fiscal Year: 18 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 10 of 20 <br />Eastern outslope of upper <br />bench of Gob Pile #2. <br />Eastern outslope of upper <br />bench of Gob Pile #2, <br />and lower stretch of East <br />Diversion ditch. <br />