Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: <br />NPDES ID. No.: <br />Inspection Period: Second Quarter 2014 <br />Inspection Date: 5-- d /- d ilq <br />General Description or Reference to Site Plan: %� )r�) <br />r� <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: <br />2. Erosion forming Gullies: <br />3. Is wave action causing erosion: <br />On the upstream embankment? <br />At the principal spillway inlet? <br />4. Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to: <br />Excellent Mod Few Poor <br />Excellent o (97w) Poor <br />Yes No—,,,-' <br />Yes No <br />Yes No 1,,-" <br />5. Is seepage occurring through the dam? Yes No1 //Could this seepage cause potential instability ?A/C e r bsP,ypd 0,4 4V <br />PRINICIPAL SPILLWAY <br />1. Is the principal spillway system in working order? <br />2. Is the inlet free of debris and restrictive material? <br />3. Is the discharge outlet free of restrictive material? <br />4. Is erosion occurring at the discharge outlet? <br />Yes <br />Yes <br />Yes <br />Yes <br />Evaluate the severity: Extensive Moderate <br />Page 1 of 2 <br />Just Starting <br />No <br />No <br />No <br />Nom/ <br />one <br />