Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: tC?r e,11C n <br />70 1aT$1 I1owasm <br />Inspection Period: Second Quarter 2014 <br />Inspection Date: <br />General Description or Reference to Site Plan: -P, N 4 65P <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: <br />2. Erosion forming Gullies: <br />3. Is wave action causing erosion: <br />On the upstream embankment? <br />At the principal spillway inlet? <br />4. Erosion of the downstream toe of the embankment? <br />Cause of erosion can be attributed to <br />Excellent Moderat Few Poor <br />Excellent Moderate (:Fle'w Poor <br />Yes No l/ <br />Yes No—.i,--' <br />Yes No i // <br />�� e �,, o o C, G)s er ^Yec) � 4P <br />5. Is seepage occurring through the dam? Yes No Z <br />Could this seepage cause potential instability? X9b - 5eC4¢Ge oasrymc) dgY r/i,e.-/ <br />50 PdM <br />PRINICIPAL SPILLWAY <br />1. Is the principal spillway system in working order? <br />2. Is the inlet free of debris and restrictive material? <br />3. Is the discharge outlet free of restrictive material? <br />4. Is erosion occurring at the discharge outlet? <br />Yes t/ <br />Yes <br />Yes <br />Evaluate the severity: Extensive Moderate <br />Page 1 of 2 <br />Just Starting <br />No <br />No <br />No <br />No <br />No <br />