Laserfiche WebLink
QUARTERLY SEDIMENTATION POND INSPECTION REPORT <br />CDMR Rule 4.05.9(17) <br />Mine: ( L-G' Y'e nc, Lo <br />NPDES ID. No.: <br />Inspection Period: Second Quarter 2014 <br />Inspection Date: ki <br />General Description or Reference to Site Plan: P0 V0 o <br />EMBANKMENT <br />1. Adequacy of the vegetative cover: Excellent Moderat <br />2. Erosion forming Gullies: Excellent Moderate <br />3. Is wave action causing erosion: <br />On the upstream embankment? Yes <br />At the principal spillway inlet? Yes <br />Few Poor <br />f—e3) Poor <br />No ✓ <br />No—),/ <br />4. Erosion of the downstream toe of the embankment? Yes / No <br />Cause of erosion can be attributed to: e(,Mt,C)0 0 &cr� zed 4 Ili 4;wie <br />�jd-540dl rio - /1, 13 n cyimn <br />5. Is seepage occurring through the dam? Yes No ✓ <br />Could this seepage cause potential instability? /L /D ose na , e ab er yrdcA # Uy <br />PRINICIPAL SPILLWAY <br />1. Is the principal spillway system in working order? Yes <br />2. Is the inlet free of debris and restrictive material? Yes <br />3. Is the discharge outlet free of restrictive material? Yes ✓ <br />4. Is erosion occurring at the discharge outlet? Yes <br />Evaluate the severity: Extensive Moderate Just Starting <br />Page 1 of 2 <br />No <br />No <br />No <br />No i/ <br />