Laserfiche WebLink
110!21 Annual Report <br />� , <br />SZ:E? <br />Permittee Name: <br />Aspen Mineral Resources, Inc. <br />Permit Number: <br />M- 1982 -020 <br />Operation Name: <br />Sooner Lucky Strike Mine Ltd <br />County: <br />Gunnison <br />Annual Fee Due: <br />$259.00 <br />Anniversary Date: <br />May 25, 2014 <br />Permit Acreage: <br />8.00 <br />Current Bond Amt: <br />$43,094.43 <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />YES NO <br />YES' NO <br />Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES rNO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />r'Mic�j-'L ai ZC ty <br />4.1 What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to he affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since p ermitted mining activities began: 00 <br />C�=%'" NO <br />YES W(Y YES <br />t3 &de- <br />N04,3; - <br />f'�0Aj �-- <br />Total acres <br />backfilled: <br />Total acres <br />seeded w/ <br />N/ <br />Total acres <br />w/topsoil <br />P/ <br />Total acres <br />mulched w// <br />/ <br />P` <br />A <br />approved mix. <br />replaced: <br />�A <br />approved mulch. <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />A <br />rate (tons): <br />0 <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />application <br />�� <br />Fertilizer <br />application <br />�/tat <br />Mulch <br />application <br />method <br />method: <br />method: <br />`! <br />96 "t �1 iY1 �71c ►.� 5 T err- -D <br />