My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-20_REVISION - M2012004
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2012004
>
2014-05-20_REVISION - M2012004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:08 PM
Creation date
5/23/2014 9:51:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012004
IBM Index Class Name
REVISION
Doc Date
5/20/2014
Doc Name
Response to adequacy review
From
Planlt
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E — RECLAMATION PLAN <br />(a) A description of the type(s) of reclamation the Operator proposes to achieve in the reclamation <br />of the affected land, why each was chosen, the amount of acreage accorded to each, and a <br />general discussion of methods of reclamation as related to the mechanics of earthmoving; <br />Upon completion of mining the slopes will be shaped to a maximum slope of 3:1 to connect with the <br />existing grade on the perimeter of the property. The land will be seeded to the grass mixture noted on <br />the reclamation plan and returned to pasture land. <br />(b) A comparison of the proposed post- mining land use to other land uses in the vicinity and to <br />adopted state and local land use plans and programs. <br />The proposed pasture is compatible with the other land uses in the vicinity, which is essentially <br />agricultural land. <br />(c) A description of how the Reclamation Plan will be implemented to meet each applicable <br />requirement of Section 3.1. <br />The Operator will carry reclamation to completion with reasonable diligence. The site reclamation will <br />be completed within approximately one year from completion of mining, but not more than five years <br />from the date the Operator informs the Board or Office that such phase has commenced. <br />Section 3.1.5 Reclamation Measures Material Handling: Grading of the upland area will be <br />consistent with the existing pre- mining grades in this area which is appropriate for this use. When <br />backfilling the upland, the operator will use overburden and non - saleable soils compacted for stability. <br />Grading will be performed to help control erosion and siltation of the affected lands through phased <br />mining, implementing good operation techniques to handle material as little as possible, and vegetation <br />of stockpiles remaining in place for more than one growing season. Although the use of erosion <br />protection devices is not anticipated, if deemed necessary by the operator at the time of excavation, silt <br />fence and haybale dams will be installed to prevent erosion. Backfilling and grading will be completed <br />as soon as feasible after the mining process is complete for each phase. <br />Maximum slopes and slope combinations will be compatible with the configuration of surrounding <br />conditions and land use. Mining will be done at a slope that is stable but maximizes gravel extraction in <br />the permit area. <br />Section 3.1.6 Water - General Requirements: The Operator will comply with applicable Colorado <br />water laws governing injury to existing water rights and with applicable state and federal water quality <br />and dredge and fill laws and regulations. <br />Section 3.1.7 Groundwater - Specific Requirements: It is not anticipated that this operation will <br />impact any groundwater. <br />
The URL can be used to link to this page
Your browser does not support the video tag.