My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-21_REVISION - M1978283
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978283
>
2014-05-21_REVISION - M1978283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:51:49 PM
Creation date
5/23/2014 9:51:06 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978283
IBM Index Class Name
REVISION
Doc Date
5/21/2014
Doc Name
Adequacy response #1 TR01
From
Environment, Inc.
To
DRMS
Type & Sequence
TR1
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-fc)o <br />Epvi*rcpn)ei)t,C. <br />LARRY E. O'BRIAN 7985 VANCE DRIVE, SUITE 205A <br />FOUNDER ARVADA, COLORADO 80003 <br />STEVAN L. O'BRIAN 303 - 423 -7297 <br />PRESIDENT FAX 303 - 423 -7599 <br />May 19, 2014 <br />Mr. Tyler O'Donnell ti <br />Division of Minerals and Geology <br />Minerals Section O1V1S1ONC �, <br />1313 Sherman Street, Suite 215 L 0 I�II��p��, !�C y LA*TIppL <br />Denver, Colorado 80203 <br />Dear Tyler; <br />Re: Walsenburg Sand and Gravel, CO. - Sand Arroyo Pit <br />M- 1978 -283 _Walsenburg County, Colorado <br />Tec ni.cal Revision 01 - Adequacy Response #1 <br />On Behalf of my client Walsenburg Sand and Gravel, CO. I <br />will respond to your May 15, 2014 adequacy review letter in the <br />order presented. <br />1. Walsenburg Sand and Gravel will commit to providing the <br />additional information listed. It is our understanding that <br />if during any given year no slopes are created, then no <br />additional reporting would be needed. If slope are created <br />this information woula draw a baseline rrom which future <br />reclamation sloping responsibilities would be determined <br />should there be damage created by water flow in the arroyo. <br />2. When I wrote the text I assumed the slope would be totally <br />removed and did not consider what happened to the slopes <br />themselves if they remain for long periods. <br />Once sloping is completed then Walsenburg Sand and Gravel <br />will shape the seedbed and revegetate the final graded area <br />with the approved seedmix as soon as possible during the <br />existing or next growing season. The upper edge will be <br />graded to divert runoff from the surrounding area around the <br />finished slopes to prevent surface water from passing down <br />the slope and creating rills and gullies as much as possi- <br />
The URL can be used to link to this page
Your browser does not support the video tag.