My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-22_REPORT - P2011010
DRMS
>
Day Forward
>
Report
>
Prospect
>
P2011010
>
2014-05-22_REPORT - P2011010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2019 11:07:54 AM
Creation date
5/23/2014 9:50:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011010
IBM Index Class Name
REPORT
Doc Date
5/22/2014
Doc Name
Annual Fee/Report/Map
From
Rio Grande Silver, Inc.
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MP Annual Report <br />11E!q,gtV,ff,o <br />MAY 22 ?014 <br />DNISIOru ru_ <br />Permittee Name: <br />Rio Grande Silver, Inc. <br />Total acres <br />Permit Number: <br />P- 2011 -010 T <br />Operation Name: <br />E ity Exploration Project <br />Total acres <br />County: <br />Mineral <br />Annual Fee Due: <br />$86.00 <br />Anniversary Date: <br />June 10, 2014 <br />Permit Acreage: <br />1 3.80 <br />1 <br />Current Bond Amt: 1 <br />$28,192.00 <br />According to Colorado Statute, each year, on the anni ersary date of the permit, an operator shall submit the Annual Fee, <br />an Annual Report and Map showing the extent of curt nt disturbances to affected land, required monitoring information, <br />reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to occur during <br />the upcoming year, any reclamation that will be perfoimed during the upcoming year, the dates for the beginning of active <br />operations, and the date active operations ceased fort the year. <br />Information contained in this report is required and 111 be reviewed by the Division upon receipt and prior to the next <br />compliance inspection of the site. If, while completin this report, you learn that your site is not in compliance with the <br />rules and the act, it is advisable that the issues be recti ied promptly to avoid possible enforcement action. <br />1. Is the affected area boundary clearly marked if yoo have an excavation or portal? <br />2. Is the site in final reclamation? <br />If "YES," please note time limits related to comp <br />3. What was the date of last exploration activity? <br />4. What date did prospecting activity end, or what d <br />5. Number of acres currently affected (exploration+ <br />)n of reclamation, Rule 3.1.3. <br />is it expected to end? Rule 5.6.1(e) <br />omplete reclamation). <br />6. Number of acres that were newly affected during jhe current report year. <br />7. Number of acres that were reclaimed during the c <br />8. Estimated new acreage to be affected in the next r <br />9. Estimated acres to be reclaimed in the next report <br />10. Total acres in various stages of reclamation, sing <br />report year. <br />year. <br />permitted exploration activities began: <br />N/A YES NO <br />N/A YES NO <br />_3/10/2013 <br />12/2016 <br />3.8 acres <br />0.0 acres_ <br />0.0 acres_ <br />0.0 acres_ <br />0.0 acres_ <br />Total acres <br />0 <br />Total acres <br />0 <br />Total acres <br />0 <br />Total acres <br />0 <br />backfrlled: <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />0 <br />Total acres <br />0 <br />Topsoil <br />N/A <br />Mulch application <br />0 <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons /ac): <br />a vd fertilizer: <br />depth in. <br />Seed <br />N/A <br />Fertilizer <br />N/A <br />Mulch <br />N/A <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />11. Is weed control being conducted in accordance wi h an approved Weed Control Plan? YES NO N/A <br />If "YES ", indicate the weed species, control area, ontrol type, application rate and treatment date on the report map. <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOV YES NO N/A <br />If "NO ", please explain: No re- disturbance to oil in the affected area. <br />N <br />
The URL can be used to link to this page
Your browser does not support the video tag.