Laserfiche WebLink
Task description: Cost summarL <br />Site: North Amethyst West Pemut ction: New NOl <br />PROJECT IDENTIFICATION <br />Task #: 000 State <br />Date: 6,11/2012 County <br />User: RCO <br />Agency or organization name: 1 <br />TASK LIST (DIRECT COSTS) <br />lorado <br />Permit`Job #: P2012008 <br />Abbreviation: None <br />Filename: P008 -000 <br />Task <br />Descri tion <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />001 <br />Close and seal drill hole (1) <br />BOREHOLE <br />1 <br />0.00 <br />$6,162.00 <br />002 <br />1 <br />$294.62 <br />Backfill drill pad sumps (3 per pad, 4 ads) <br />DOZER <br />1.88 <br />003 <br />1 <br />$1,160.00 <br />Pull up material for recontourin ads (4) <br />EXCAVATE <br />10.64 <br />Recontour grading of pad areas <br />DOZER <br />22.32 <br />004 <br />1 <br />$3,489.22 <br />Pull up material onto access road for reconto <br />EXCAVATE <br />8.08 <br />005 <br />1 <br />$881.00 <br />006 <br />Recontour grading of access road <br />I DOZER <br />1 <br />11.29 <br />$1,765.51 <br />007 <br />1 <br />$680.00 <br />Rip co action on access roads and pads <br />RIPPER <br />4.35 <br />008 <br />1 <br />$2,055.56 <br />Res read topsoil on pads and access road <br />DOZER <br />13.15 <br />Reve etate disturbed areas <br />REVEGE <br />10.00 <br />009 <br />1 <br />$1,622.16 <br />Haul reclamation equipment to and from site <br />MOBILIZE <br />6.50 <br />O10 <br />1 <br />$2,854.34 <br />SUBTOTALS: <br />88.21 <br />$ $20,964.41 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Total = $423.48 <br />Performance bond: 1.05 <br />Total = $220.13 <br />Job superintendent: 22.00 <br />Total = $1,304.60 <br />Profit: 10.00 <br />Total = $2,096.44 <br />TOTAL O & P = $4,044.65 <br />CONTRACT AMOUNT (direct + O & P) = $25,009.06 <br />LEGAL - ENGINEERING - PROJECT MANAG <br />MENT: <br />Financial warranty processing (legal/related <br />osts): 500.00 <br />Total = 500.00 <br />Engineering work and/or contract/bid preparation: <br />0.00 <br />Total = $0.00 <br />Reclamation management and/or administration: <br />5.00 <br />$1,250.45 <br />CONTING <br />NCY: 0.00 <br />Total = $0.00 <br />TOTAL <br />INDIRECT COST = $5,795.10 <br />TO <br />AL BOND AMMOUNT <br />(direct + indirect) = $26,75951 <br />