Laserfiche WebLink
11 Ab <br />MIle <br />CQA ACTIVITIES: <br />t) Field Activities: Observation of construction activities during this reporting period included: Slope grading and fill <br />placement; Ambient and fill temperature monitoring and recording; Underground working remediation and confirmatory <br />drilling: Production drilling and blasting; Testing and sampling of DCF; and secondary underdrain trenching. <br />11) Laboratory Activities: Laboratory testing continued with Permeability, Particle Size Distribution, Atterberg Limits, <br />Moisture - Density relationships, gradations, material classification, identifications, and field material sampling were <br />performed during this reporting period. <br />The following samples were collected and returne to AMEC's laboratory for analysis: <br />Drain Cover Fill sample numbers DCF 79 and DCF 80 <br />Note: Samples labeled with the suffix `R° are samples of Record / QA samples; those without are QC samples. <br />General Proiect Items <br />Meetings and Discussions: The Contractor Meeting occurred on May 14, 2014 with CC &V Projects, AMEC, and Ames. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, AMEC, and Ames. <br />Miscellaneous: <br />Drain cover fill processing continued. <br />Rip rap processing continued. <br />Geophysical surveying was conducted in the F SSA. <br />Deliveries: None <br />Submitted by: <br />Reviewed By: <br />Tim Burkhard <br />Project Resid( <br />Phone: 719.61 <br />Approved By: <br />CC &V Project, <br />Page 4 of 7 <br />doe <br />