My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-23_PERMIT FILE - M2014028
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2014028
>
2014-05-23_PERMIT FILE - M2014028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:44:12 PM
Creation date
5/23/2014 9:15:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2014028
IBM Index Class Name
PERMIT FILE
Doc Date
5/23/2014
Doc Name
Notices
From
DRMS
To
Various
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PEAK VIEW GRAVEL PIT <br />HUERFANO COUNTY GOV <br />PERMIT STATUS REGARDING <br />34- 32.5 -103. Definitions <br />RARY CESSATION <br />(11) "Life of the mine" means, with res t to a permit granted pursuant to section <br />34- 32.5 -110, 34- 32.5 -111, or 34- 32.5 -11 , a period lasting as long as: <br />(b) Construction material reserves <br />the operator plans to, or does, t <br />or more if such operator files a <br />nonproduction, a plan for the n <br />comply with reclamation and o <br />maintain the operation in a non <br />cessation shall not apply to ope <br />included in their permit applicg <br />less than one hundred eighty d, <br />1. 13.5 Notice by Operator <br />shown by the operator to remain in the operation and <br />rorarily cease production for one hundred eighty days <br />ice with the board stating the reasons for <br />nption of production, and the measures taken to <br />necessary activities as established by the board to <br />ducing state. The requirement of a notice of temporary <br />ors who resume operating within one year and have <br />is a statement that the affected lands are to be used for <br />per year. <br />(1) If the Operator plans to, or does, tem rarily cease production of the mining operation for <br />one hundred eighty (180) days or more, t e Operator must file a Notice of Temporary Cessation <br />in writing, to the Office. <br />In an attempt to comply with the above ref <br />for the Extraction of Construction Material,. <br />Colorado Mined Land Reclamation Board <br />The applicant/operator states for the recor <br />operations for one hundred eighty (180) d, <br />commercial operation but rather a Colorad <br />product to maintain regional county roads. <br />upon the requirements of the road mainter <br />Commissioners and the Huerfano Roads <br />;rented portions of the Colorado Land Reclamation Act <br />( "Act") and the Mineral Rules and Regulations of the <br />'or the Extraction of Construction Materials ( "Rules "). <br />i that this operation may cease production of mining <br />Sys or more from time to time. This operation is not a <br />o County Gravel Pit (Huerfano County); they use the <br />This operation will be mined intermittently depending <br />ante scheduled by the Huerfano Board of County <br />nd Bridge Department <br />The operators understands that to maintai <br />their IS and/or TC standing, they must report their <br />status to the Board through their Annual R <br />a5ports. The operator will abide by the required rules as <br />stated in the Colorado Land Reclamation <br />ct for the Extraction of Construction Materials ( "Act") <br />and the Mineral Rules and Regulations of <br />he Colorado Mined Land reclamation Board for the <br />Extraction of Construction Materials ( "Rul <br />"). <br />
The URL can be used to link to this page
Your browser does not support the video tag.