�0/11
<br />-6-
<br />is permit, or assess a civil penalty, upon a finding that the permittee
<br />mit, the Act, the Mineral Rules and Regulations, or that information
<br />misrepresent important material facts;
<br />ations affect areas beyond the boundaries of an approved permit
<br />as permittee can result;
<br />4. Any modification to the approved mining and reclamation plan from those described in your approved
<br />application requires you to submit a pe t modification and obtain approval from the Board or Office;
<br />5. It is your responsibility to notify the Office of any changes in your address or phone number;
<br />6. Upon permit issuance and prior to eg-mm 8 on -site mining activity, you must post a sign at the entrance of
<br />the mine site, which shall be clearly visi le from the access road, with the following information (Rule 3.1.12):
<br />a. the name of the operator;
<br />b. a statement that a reclam
<br />Reclamation Board; and,
<br />c. the permit number.
<br />7. The boundaries of the permit bou
<br />visible and adequate to delineate such
<br />permit for the operation has been issued by the Colorado Mined Land
<br />area must be marked by monuments or other markers that are clearly
<br />lanes prior to site disturbance.
<br />8. It is a provision of this permit th t the operations will be conducted in accordance with the terms and
<br />conditions listed in your application, as m ell as with the provisions of the Act and the Construction Material Rules
<br />and Regulations in effect at the time the ermit is issued.
<br />9. Annually, on the anniversary date o permit issuance, you must submit an annual fee as specified by Statute,
<br />and an annual report which includes a rn tp describing the acreage affected and the acreage reclaimed to date (if
<br />there are changes from the previous ye r), any monitoring required by the Reclamation Plan to be submitted
<br />annually on the anniversary date of the pe rmit approval. Annual fees are for the previous year a permit is held. For
<br />example, a permit with the anniversary to of July 1, 1995, the annual fee is for the period of July 1, 1994 through
<br />June 30, 1995. Failure to submit your ai mual fee and report by the permit anniversary date may result in a civil
<br />penalty, revocation of your permit, and forfeiture of your financial warranty. It is your responsibility, as the
<br />permittee, to continue to pay your annual fee to the Office until the Board releases you from your total reclamation
<br />responsibility.
<br />N/A 10. For ioint venture/partnership operators: the signing representative is authorized to sign this document and a
<br />power of attorney (provided by the pa er(s)) authorizing the signature of the representative is attached to this
<br />application.
<br />2. The Board may suspend or revoke
<br />violated the terms or conditions of this F
<br />contained in the application or your pem
<br />3. If your mining and reclamation o
<br />boundary, substantial civil penalties, to y
<br />�0/11
<br />-6-
<br />is permit, or assess a civil penalty, upon a finding that the permittee
<br />mit, the Act, the Mineral Rules and Regulations, or that information
<br />misrepresent important material facts;
<br />ations affect areas beyond the boundaries of an approved permit
<br />as permittee can result;
<br />4. Any modification to the approved mining and reclamation plan from those described in your approved
<br />application requires you to submit a pe t modification and obtain approval from the Board or Office;
<br />5. It is your responsibility to notify the Office of any changes in your address or phone number;
<br />6. Upon permit issuance and prior to eg-mm 8 on -site mining activity, you must post a sign at the entrance of
<br />the mine site, which shall be clearly visi le from the access road, with the following information (Rule 3.1.12):
<br />a. the name of the operator;
<br />b. a statement that a reclam
<br />Reclamation Board; and,
<br />c. the permit number.
<br />7. The boundaries of the permit bou
<br />visible and adequate to delineate such
<br />permit for the operation has been issued by the Colorado Mined Land
<br />area must be marked by monuments or other markers that are clearly
<br />lanes prior to site disturbance.
<br />8. It is a provision of this permit th t the operations will be conducted in accordance with the terms and
<br />conditions listed in your application, as m ell as with the provisions of the Act and the Construction Material Rules
<br />and Regulations in effect at the time the ermit is issued.
<br />9. Annually, on the anniversary date o permit issuance, you must submit an annual fee as specified by Statute,
<br />and an annual report which includes a rn tp describing the acreage affected and the acreage reclaimed to date (if
<br />there are changes from the previous ye r), any monitoring required by the Reclamation Plan to be submitted
<br />annually on the anniversary date of the pe rmit approval. Annual fees are for the previous year a permit is held. For
<br />example, a permit with the anniversary to of July 1, 1995, the annual fee is for the period of July 1, 1994 through
<br />June 30, 1995. Failure to submit your ai mual fee and report by the permit anniversary date may result in a civil
<br />penalty, revocation of your permit, and forfeiture of your financial warranty. It is your responsibility, as the
<br />permittee, to continue to pay your annual fee to the Office until the Board releases you from your total reclamation
<br />responsibility.
<br />N/A 10. For ioint venture/partnership operators: the signing representative is authorized to sign this document and a
<br />power of attorney (provided by the pa er(s)) authorizing the signature of the representative is attached to this
<br />application.
<br />
|