Laserfiche WebLink
A F- J- 11 <br />Page 2 of 3 <br />RECEIVED <br />Permittee Name: <br />Connell Resources, Inc. <br />Permit Number: <br />M- 1980 -002 MAY 2 2 2n <br />Operation Name: <br />Tucker Aggregate Pit <br />County: <br />Weld <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />June 1, 2014 MINING <br />Permit Acreage: <br />215.08 <br />Current Bond Amt: <br />$131,400.00 <br />,TION <br />Y <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each ear, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed y the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptl to avoid possible enforcement action. <br />1. Is the site identification sign posted in <br />2. Is the affected area boundary clearly marked in <br />3. Is the mine site in final reclamation (all material <br />If "YES," please note time limits related to corn] <br />with Rule 3.1.12(1). YES NO <br />,ordance with Rule 3.1.12(2). YES NO <br />(traction and stockpile removal is complete)? YES NO <br />:tion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing Or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per yc <br />If "NO ", please review Rule 1.13 to assure that y <br />6. Has this mine been granted: a) approval of TE <br />b) approval for Ir <br />7. Number of acres currently affected (mining + inc <br />8. Number of acres that were newly affected during <br />9. Number of acres that were reclaimed during the c <br />10. Estimated new acreage to be affected in the next <br />mine is in compliance. <br />CESSATION Status? <br />NT OPERATION? <br />and or unreleased reclamation). <br />current report year. <br />report year. <br />year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, sine permitted mining activities began: <br />oil -501n I <br />0 NO <br />YES <br />YES Fn <br />r, . <br />/5" D <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />/ j, Y <br />seeded w/ <br />w /topsoil <br />3 c� <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />,321� <br />fertilized w/ <br />replacement <br />rate (tons /ac): <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />