Laserfiche WebLink
It <br />SECTION 2.05.6(3)(b)(v) <br />HYDROLOGIC RECLAMATION PLAN <br />TABLE OF CONTENTS <br />Page No. <br />HYDROLOGIC RECLAMATION PLAN 1 <br />Introduction 1 <br />Practices Employed to Minimize the Impacts of Mining on the Hydrologic System 1 <br />Ground Water Quality 1 <br />Ground Water Quantity 2 <br />Surface Water Quality 3 <br />Surface Water Quantity 3 <br />Stream Buffer Zones 3 <br />Water Rights 4 <br />Alternative Water Supplies 4 <br />Protection and Mitigation Plan 4 <br />Introduction 4 <br />Ground Water Monitoring Plan 5 <br />Ground Water Quality 5 <br />Ground Water Quantity 5 <br />Surface Water Monitoring Plan 5 <br />Surface Water Quality 5 <br />Surface Water Quantity 6 <br />October 2013 (TR -05) <br />E: \New Horizon \DRMS \NHN Permit \04_Technical Revisions TR \TR -05 \Documents from Jason \2.05.6(3)(b)(v) TOC Hydrologic Reclamation Plan_TR- <br />05.docx <br />