My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-13_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-05-13_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:58 PM
Creation date
5/21/2014 9:23:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/13/2014
Doc Name
Reclamation Cost Estimate
Section_Exhibit Name
Volume I 3.02.2 Reclamation Cost Estimate RN3
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
349
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Remove West Terror Creek Flumes <br />Site: Bowie No. 2 Mine <br />PROJECT IDENTIFICATION <br />Task #: OOJ <br />Date: 4/15/2014 <br />User: SLB <br />Permit Action: Minor Revision <br />150 <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job #: C1996083 <br />Abbreviation: None <br />Filename: C083 -00j <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />362 <br />Remove West Terror Creek Flumes <br />DEMOLISH <br />1 <br />8.00 <br />$340.09 <br />SUBTOTALS: <br />8 <br />$340.09 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$6.87 <br />1.05% <br />Total = <br />$3.57 <br />0.00 hrs <br />Total = <br />$0.00 <br />10.00% <br />Total = <br />$34.01 <br />TOTAL O & P = <br />$44.45 <br />0.00 <br />CONTRACT AMOUNT (direct + O & P) = <br />$384.54 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />4.00% <br />Total = <br />$15.38 <br />Reclamation management and/or administration: <br />3.13% <br />$12.04 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$71.87 <br />TOTAL BOND AMOUNT (direct + indirect) = $411.96 <br />
The URL can be used to link to this page
Your browser does not support the video tag.