My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-13_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-05-13_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:58 PM
Creation date
5/21/2014 9:22:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/13/2014
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.6(6) <br />Subsidence Monitoring <br />Monument <br />Location <br />Frequency <br />Purpose <br />17 -A <br />Hubbard Creek <br />Quarterly <br />To confirm subsidence does not <br />occur in the limited extraction zone <br />along Hubbard Creek. B -8 Panel, <br />the last panel adjacent to Hubbard <br />Creek, was complete by the end of <br />2009. Monitoring will cease at the <br />end of 2011 which is two years after <br />the B -8 panel was complete. <br />To determine subsidence over <br />multiple seam mining. The <br />subsidence monuments will have <br />pre - longwall mining base line <br />measurements, post D Seam <br />longwall mining measurements and <br />post B Seam longwall mining <br />measurements. <br />Monitoring of these 20 monuments <br />will be quarterly through 2007 and <br />quarterly in 2009 at which time <br />monitoring of the 20 monuments will <br />cease. <br />17 -B <br />Hubbard Creek <br />Quarterly <br />17 -C <br />Hubbard Creek <br />Quarterly <br />17 -D <br />Hubbard Creek <br />Quarterly <br />17 -E <br />Hubbard Creek <br />Quarterly <br />17 -F <br />24 -D <br />Hubbard Creek <br />Monuments are <br />located above <br />the west D -Seam <br />and west B- <br />Seam panels. <br />The D -Seam <br />panels were <br />numbered WD -1, <br />WD -2 & WD -3 <br />and were mined <br />from 3/04 to <br />3/05. The B- <br />Seam panels <br />were numbered <br />B -1, B -2 & B -3 <br />and were mined <br />from 4/05 to <br />10/06. <br />Quarterly <br />Quarterly <br />24 -E <br />Quarterly <br />24 -F <br />Quarterly <br />24 -G <br />Quarterly <br />25 -A <br />Quarterly <br />25 -B <br />Quarterly <br />25 -C <br />Quarterly <br />25 -D <br />Quarterly <br />25 -E <br />Quarterly <br />25 -F <br />Quarterly <br />26 -A <br />Quarterly <br />26 -B <br />Quarterly <br />26 -C <br />Quarterly <br />26 -D <br />Quarterly <br />26 -E <br />Quarterly <br />26 -F <br />Quarterly <br />26 -G <br />Quarterly <br />27 -A <br />Quarterly <br />27 -B <br />Quarterly <br />27 -C <br />Quarterly <br />37 -A, B, C & E <br />Terror Creek <br />Quarterly <br />To confirm subsidence does not <br />occur in the limited extraction zone <br />along Terror Creek or the <br />Transmission Line <br />37 -D & F <br />Transmission <br />Line Towers <br />Quarterly <br />Seasonal access difficulties usually restrict quarter monitoring to three times per year. <br />PR -13 2.05-163- 02/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.