My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-13_PERMIT FILE - C1996083A (3)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2014-05-13_PERMIT FILE - C1996083A (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:58 PM
Creation date
5/21/2014 9:22:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
5/13/2014
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
Volume I 2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 2.05.6(6) <br />J <br />(c)(i) <br />di <br />( )( ) <br />(e) <br />(e)(F)(IV) <br />(f) <br />PR -12 <br />AAeRovED <br />I l/l e /1,0 <br />Permit stipulation No. 9 stated in part: Mining with a projected angle of draw <br />that is within one mile on the Terror Creek Reservoir (Bruce Park Dam) will <br />not be approved until all necessary monitoring data, analysis, reports and <br />subsidence control plan details are approved by the Division and it is shown <br />that such mining will not adversely impact the Dam. A subsidence and <br />seismic monitoring program was developed exclusively for the Bruce Park <br />Dam and Bruce Park landslide. However, since the mine plan was changed <br />(PR -12) and no mining with a projected angle of draw that is within one mile <br />on the Terror Creek Reservoir will occur, the subsidence and seismic <br />monitoring program for the Bruce Park dam and Bruce Park landslide will be <br />suspended. Should mining be proposed within one mile of the Bruce Park <br />dam and Terror Creek Reservoir, the subsidence control plan will be <br />reactivated. The suspended seismic monitoring program is explained in <br />Volume IIIA, Exhibit 18 with specific emphasis on the quarterly seismic <br />monitoring reports. The suspended monitoring program for the Bruce Park <br />landslide is presented in Exhibit 20. <br />A subsidence control plan is not required. <br />Not applicable. <br />Not applicable. <br />A description of the subsidence control plan, prepared by appropriately <br />qualified professionals follows: <br />2.05-144- 07/10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.