My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-20_REVISION - M1997039
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1997039
>
2014-05-20_REVISION - M1997039
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:00:19 PM
Creation date
5/20/2014 11:18:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997039
IBM Index Class Name
REVISION
Doc Date
5/20/2014
Doc Name
Conversion application CN01
From
Wyatt Redi-Mix Co.
To
DRMS
Type & Sequence
CN1
Email Name
TAK
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DATE: April 29, 1997 <br />ACCESS PERMIT NUMBER 397051 - SHEET 3 <br />ISSUED TO: Williams Livestock <br />TERMS AND CONDITIONS (CONT'D) <br />necessary to protect existing permitted utilities, such as <br />an encasement will be the responsibility of the Permittee. <br />Any damage or disruption to any utilities during the <br />construction shall be the Permittee's responsibility and <br />shall be repaired or replaced at no cost to the Department. <br />14. Any damage to any present highway facilities including <br />traffic control devices shall be repaired immediately at no <br />cost to the Department and prior to continuing other work. <br />Any mud or other material tracked or otherwise deposited on <br />the roadway shall be removed daily or as ordered by the <br />Department inspector. <br />15. Areas of roadway and /or right -of -way disturbed during this <br />installation shall be restored to their origional <br />conditions, to insure proper strength, drainage and erosion <br />control. <br />16. Any incomplete construction activity on the State Highway <br />that must be left overnight, shall be barricaded and signed <br />in accordance with the Manual on Uniform Traffic Control <br />Devices and other applicable standards. <br />17. Open cuts which are 6 inches in depth, within 30 feet of the <br />edge of the State Highway traveled way will not be left open <br />at night, on weekends, or on holidays. <br />18. No more than 6 feet of trench areas shall be opened at any <br />one time. Open trenches and other excavations within the <br />State Highway right -of -way shall be backfilled and /or paved <br />before 3:30 P.M. of each working day or be protected in <br />accordance with the M.U.T.C.D.. <br />19. The area around the new work shall be well graded to drain, <br />top soiled, fertilized, mulched and re- seeded in accordance <br />with the Department standard specifications. <br />20. When it is necessary to remove any highway right -of -way <br />fence, the posts on either side of the access entrance shall <br />be securely braced with approved end posts and in <br />conformance with the Department's M -607 -1 standard, before <br />the fence is cut, to prevent slacking of the remaining <br />fence. All posts and wire removed shall be returned to the <br />Department. <br />21. All excavations for utility lines, culverts, trenches or <br />tunnels shall meet the requirements of the Occupational, <br />Safety and Health Administration (OSHA), Colorado Industrial <br />Commission, Colorado Division of Mines or the Colorado <br />Department of Transportation, whichever applies. <br />22. The access shall be constructed 30 feet wide, with 50 foot <br />radii. <br />23. The access shall be constructed perpendicular to the travel <br />lanes of the State Highway for a minimum distance of 50 <br />feet, and shall slope down and away from the adjacent <br />pavement edge at a rate of 2% grade for a minimum of 20 <br />feet. If curb and gutter are present, the slope shall be <br />calculated from pan line to pan line. Any revisions to this <br />requirement shall. be subject to Department review and <br />approval prior to commencement of any work within the <br />highway right -of -way. <br />24. The access shall be completed in an expeditious and safe <br />manner and shall be finished within 45 days from initiation <br />of construction within State Highway right -of -way. <br />
The URL can be used to link to this page
Your browser does not support the video tag.