Laserfiche WebLink
-4- <br />Cropland(CR) <br />X Rangeland(RL) <br />-Pastureland(PL) <br />Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />Cropland(CR) Pashueland(PL) <br />X Rangeland(RL) Fores"(FR) <br />Residential(RS) Receatio�RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />Wildlife Habi d(WL) <br />t,erretal Agricuthme(GA) <br />Wildlife Habkd(WL) <br />IndustriaUCommerc ial(IC) <br />14. Briefly explain mining method (eg. tru&Wwvd): Scrape, dozer, dump track, excavator, or loader to <br />remove and Modgrile topsoil. Process sand and gravel by crushing, screening, and or refining. <br />15. same as original Permit #M -1997 -039 <br />13.1 Briefly explain mining method (e g. UwVshoveI): Dozers. loaders, dump trucks, excavators or scrapers will be used for <br />striding topsoil and stodTilin& Loaders or excavtors and equigagg will beased to process and refine material to be <br />List any designated chemicals or acidixoducing materials to be used or stored within permit area Chemicals used will be only <br />those necessary to come dif%t types of asphalt or concrete. Fertilizer will be those recorded by those qualified to stabilize <br />16. RcjCdVdw of AmendsHu t or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s)- <br />Conversion from Limited (110) to Regular ( 112) will be for a continuous flow of mining operations starting with the existing pit <br />and moyma south into Stage 1 and continuing to Stage 35 with the goal of never having more than 10 acres of land exposed at <br />any given time with 5 acres in redamation, 5 acres in stockpiling and processing and 5 acres in mining, as described in the new <br />mining plan F-ib bit D <br />