Laserfiche WebLink
(3) The affected land will be monumented for easy delineation. <br />(d) Where applicable, the operator /applicant has plans developed for the segregation, <br />preservation, replacement, compaction and grading of soil used for revegetation. The <br />revegetation plan will contain a list of the preferred species of grasses to be planted as <br />recommended by the field office of the NRCS. All seeds recommended should be <br />available and in sufficient quantity to accomplish the revegetation. <br />Seedbed preparation has been covered in Section 3.1 of this application. <br />(e) The schedule of reclamation will closely follow the mining phasing, and the operator <br />would expect to start reclamation as soon as feasible after mining has been completed <br />in each phase. <br />The final grading also will be done in conjunction (concurrently) with mining. All <br />backsloping, daylighting and contouring will be done as mining progresses. <br />As stated before, this land will be used for grazing cattle as a final land use, and all of the <br />NRCS recommendations will be done. <br />Topsoil will be replaced at between 6 and 8 inches on all disturbed areas. <br />Attached is the Seed Mixture recommendation from the NRCS Walsenburg Office. <br />As stated before, this land will be used for grazing cattle as a final land use <br />Topsoil will be replaced at between 6 and 8 inches on all disturbed areas. <br />