Laserfiche WebLink
(� The backsloping and final pit floor will be graded concurrent with the mining. It is <br />planned to start reclaiming 5 to 10 acres areas as they are deemed mined -out. This <br />allows the operator the allotted time to establish a planned reclamation plan and <br />continue to mine. <br />As stated before, this is on an upland terrace deposit with the following characteristics: <br />(SOILS INFO) <br />