Laserfiche WebLink
RULE 6.4.11 EXHIBIT "L" <br />Construction Materials Rule 4.1.2 (2) <br />(2) No Financial Warranty shall be required where <br />the Operator is a unit of municipal or county government <br />or the State Department of Transportation and the Operator <br />submits a written guarantee, in lieu of a financial warranty, <br />stating that the affected lands will be reclaimed in accordance <br />with the terms of the permit, these Rules, and Section 34- 32.5 -116, C.R.S. <br />RECLAMATION COST <br />PEAK VIEW GRAVEL PIT EXTENDED <br />TOTAL BOND AMOUNT $0 <br />QTY. <br />UNIT <br />UNIT COST COST <br />1.) REVEGETATION SEEDING & PREP. <br />40 <br />AC <br />$0.00 <br />$0 <br />la.) ESTIMATED FAILURE RATE 25% <br />10 <br />AC <br />$0.00 <br />$0 <br />2.) CHISEL (RIP) STOCKPILE /PROCESS AREA <br />5 <br />AC <br />$0.00 <br />$0 <br />3.) GRADE PIT FLOOR <br />5 <br />AC <br />$0.00 <br />$0 <br />4.) BACKFILL OVERBURDEN FROM THE PIT WALLS & BERMS <br />0 <br />LCY <br />$0.00 <br />$0 <br />5.) SPREAD TOPSOIL FROM BERMS & STOCKPILES <br />32250 <br />LCY <br />$0.00 <br />$0 <br />6.) MULCH <br />40 <br />AC <br />$0.00 <br />$0 <br />7.) WEED CONTROL <br />40 <br />AC <br />$0.00 <br />$0 <br />8.) MOB /DEMOB CAT D8N <br />1 <br />LS <br />$0.00 <br />$0 <br />9.) MOBILIZATION & DEMOBILIZATION AL OTHER IMPLIMENTS & TRACTORS <br />1 <br />LS <br />$0.00 <br />$0 <br />TOTAL DIRECT COST <br />$0 <br />INDIRECT COST <br />PUBLIC LIABILITY INSURANCE <br />1.55% <br />$0 <br />CONTRACTOR PERFORMANCE BOND COST <br />1.05% <br />$0 <br />CONTRACTOR PROFIT <br />10.00% <br />$0 <br />DIVISION OF MINERALS & GEOLOGY ADMIN. <br />EXPENSE <br />5.00% <br />$0 <br />ADDITIONAL SUPERVISION <br />4.00% <br />$0 <br />ENGINEERING WORK <br />0.00% <br />$0 <br />DMG ADMIN. FEES <br />5.00% <br />$0 <br />CONTINGENCY <br />2.00% <br />$0 <br />TOTAL BOND AMOUNT $0 <br />