My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-11_REVISION - C1981008
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981008
>
2014-05-11_REVISION - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:53 PM
Creation date
5/16/2014 10:19:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
Revision
Doc Date
5/11/2014
Doc Name
Soil Replacement Correspondence
From
Morgan/Turner
To
DRMS
Type & Sequence
PR8
Email Name
DAB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 10, 2014 <br />Morgan Ranch <br />Nucla, Colorado 81424 <br />Mr. David Berry <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Main #: 303 - 866 -3567 <br />Fax #: 303 - 832 -8106 <br />Re: Topsoil Spreading Change <br />Dear Mr. Berry: <br />We are requesting placement of the mixed topsoil and A topsoil as one unit by calling them the <br />same topsoil. We observed the topsoil stripping and know the mixed topsoil is almost entirely <br />A topsoil. The soil tests also show that the mixed topsoil is almost identical to the A topsoil. <br />We want the mixed topsoil and A topsoil be treated as equal soils. We want the mixed and A <br />topsoil layers placed as one layer for these four reasons: <br />• Reduce compaction <br />• Less mixing of soil layers <br />• More timely completion <br />• We previously requested this change, but it did not get into the permit. <br />Reduce Compaction: One third of the B topsoil layer has been placed and the 34 inches of B <br />topsoil is far more compacted than expected. The B topsoil is dumped in place by end dump <br />trucks, rough graded by a bulldozer, and finished graded by a motor grader. We tried ripping <br />the B topsoil using farm parabolic rippers and they failed. We have had to use a D -7 bulldozer <br />with two ripper shanks prior to rock picking. The ripping and cross ripping does not break up all <br />the compaction and the compaction is even more pronounced in the damper topsoil. <br />Since the mixed topsoil layer at 7 inches thick and the A topsoil layer at 15 inches thick will be <br />placed using the same procedure, we know these layers will be even more compacted because <br />MORGAN REQUEST Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.