Laserfiche WebLink
DEMOLITION WORK <br />Task description: Demolish and Remove All Structures <br />Site: McClane Canyon Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 028 State: Colorado <br />Date: 12/30/2013 County: Garfield <br />User: ZTT <br />Agency or organization name <br />UNIT COSTS <br />DRMS <br />Table 3.7 -1 Page 45 <br />Permit/Job#: C1980004 <br />Abbreviation: None <br />Filename: C004 -028 <br />Location adjustment: 98.50 % <br />Structure or Item <br />Dimensions <br />Demolition Menu <br />Quantity <br />Unit <br />Unit <br />Total Cost <br />Description <br />Selection <br />Cost <br />Trailer #1 <br />10'x32'x8' <br />Bldg. (SN) demo. /on- <br />2,560.00 <br />CF <br />$0.19 <br />$486.40 <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />Trailer #2 <br />121x54'x8' <br />Bldg. (SN) demo. /on- <br />5,184.00 <br />CF <br />$0.19 <br />$984.96 <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />- Footers <br />2 @3'xl.5'x54' <br />Demo. and on -site <br />108.00 <br />LF <br />$15.29 <br />$1,651.64 <br />disposal in existing pit, <br />1.5 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />Trailer #3 <br />12'x54'x8' <br />Bldg. (SN) demo. /on- <br />5,184.00 <br />CF <br />$0.19 <br />$984.96 <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />- Footers <br />2 @3'xl.5'x54' <br />Demo. and on -site <br />108.00 <br />LF <br />$15.29 <br />$1,651.64 <br />disposal in existing pit, <br />1.5 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />Trailer #4 <br />12'x54'x8' <br />Bldg. (SN) demo. /on- <br />5,184.00 <br />CF <br />$0.19 <br />$984.96 <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />- Footers <br />2 @3'x1.5'x54' <br />Demo. and on -site <br />108.00 <br />LF <br />$15.29 <br />$1,651.64 <br />disposal in existing pit, <br />1.5 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />Warehouse Trailer <br />8'x40'x8' <br />Bldg. (SN) demo. /on- <br />2,560.00 <br />CF <br />$0.19 <br />$486.40 <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />Sasser Substation <br />12'x40'x10' <br />Bldg. (SN) demo. /on- <br />4,800.00 <br />CF <br />$0.19 <br />$912.00 <br />site disposal in <br />excavated pit - Max. <br />10,000 ft. haul <br />- Floor <br />I0'x40'x6" <br />Demo. and on -site <br />480.00 <br />SF <br />$1.70 <br />$815.52 <br />disposal in existing pit, <br />6 in. thick - Max. <br />10,000 ft. haul <br />- Footers <br />3'x l .5'x 104 LF <br />Demo. and on -site <br />104.00 <br />LF <br />$15.29 <br />$1,590.47 <br />disposal in existing pit, <br />1.5 ft. x 3 ft. - Max. <br />10,000 ft. haul <br />