Laserfiche WebLink
Task description: <br />Site: McClane Ca <br />Table 3.7 -1 Page 37 <br />Page 1 of 2 <br />BULLDOZER WORK <br />Replace Topsoil from Stockpile to Coal Mine Waste Pile Pond <br />Mine Permit Action: MT7 Permit/Job#: C1980004 <br />PROJECT IDENTIFICATION <br />Task #: 023 State <br />Date: 12/30/2013 County <br />User: ZTT <br />Colorado <br />Garfield <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation <br />Filename <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$257.87 <br />$257.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,000 <br />Swell factor: 1.125 <br />Loose volume: 1,125 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />700.0 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,600 feet <br />50 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 AVG. <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 GEN. <br />None <br />C004 -023 <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />^$37.41 <br />0 <br />Operator Cost/Hour. <br />NA <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$257.87 <br />$257.87 <br />MATERIAL QUANTITIES <br />Initial Volume: 1,000 <br />Swell factor: 1.125 <br />Loose volume: 1,125 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />200 feet <br />700.0 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />5,600 feet <br />50 lbs /LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 AVG. <br />Material consistency: 1.000 (CAT HB) <br />Dozing method: 1.000 GEN. <br />None <br />C004 -023 <br />CIRCES Cost Estimating Software <br />