Laserfiche WebLink
Table 3.7 -1 Page 33 <br />Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil from Stockpile toRoad from McClane to Munger <br />Site: McClane Canyon Mine Permit Action: MT7 Permit/Job#: C1980004 <br />PROJECT IDENTIFICATION <br />Task #: 021 State: Colorado <br />Date: 12/30/2013 County: Garfield <br />User: ZTT <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />- Scraper: <br />- Dozer: <br />Cat 627G <br />NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: NA <br />-Water Truck: NA <br />Abbreviation: None <br />Filename: C004 -021 <br />COSTShift basis: 1 per day <br />cost nreakdoW : bcraper WOrK team Juppon C u1 <br />men[ maintenance <br />n ul ulelll <br />Earth - Loam <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$63.31 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$179.56 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$30.02 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$272.89 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$272.89 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />Total work team cost/hour: 2$ 72.89 <br />MATERIAL OUANTITIES <br />Initial volume: 1,719 CCY Swell factor: 1.115 <br />Loose volume: 1,917 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: <br />2,100 lbs1LCY <br />Material description: <br />Earth - Loam <br />Rated Payload: <br />52,800 pounds <br />Payload Capacity: <br />25.14 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />15.70 <br />LCY <br />Heaped Volume: <br />22.00 <br />LCY <br />Average Volume: <br />18.85 <br />_ LCY <br />Adjusted Capacity: <br />18.85 <br />LCY <br />CIRCES Cost Estimating Software <br />