Laserfiche WebLink
DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />December 31, 2013 <br />McClave Canyon Mine, Permit C- 1980 -004 <br />Midterm Review 07 <br />ZTT <br />Table 3.7 -1 Page 23 <br />STATE OF COLORADO <br />COLORADO <br />DIVISION OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />Task 015 — Stream Channel Erosion Protection $57,467.26 <br />Riprap protection for channels R -2, R -5, R -6 and R -8 requires 650 cu. Yrd. Of riprap. Machine Placed Riprap for Slope <br />Protection (from RS Means Building Construction Cost Data, 2013 Edition, Section 3137 13.10 0200) has a cost of <br />$75.75 /cubic yard. <br />(650 cu. yd.) x ($75.75/cu. yd.) = $49,237.50 <br />Erosion blanket protection for channels R -1, R -3, R -4, R -7 and R -12 requires 1912 sq. yd. of blanket. The cost of the <br />blanket including installation is $1.73 /sq. yd. (from RS Means Construction Cost Data, 2013 Edition; Section 3125 14.16 <br />0020). <br />(1,912 sq. yd.) x ($1.73 /sq. yd.) = $3,307.76 <br />Total Erosion Control = ($49,237.50) + ($3,307.76) = $52,545.26 <br />Using 1 Cat 324D L Excavator for 40 hours (1 week). <br />Cost for Cat 324D L Excavator: ($123.05/hr) x (40 hrs) = $4,922.00 <br />Stream Channel Erosion Protection — Total Cost <br />($52,545.26) + ($4,922.00) = $57,467.26 <br />Office of — Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />