My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-04-22_PERMIT FILE - C1980004A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980004
>
2014-04-22_PERMIT FILE - C1980004A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2017 7:30:47 AM
Creation date
5/15/2014 1:11:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004A
IBM Index Class Name
Permit File
Doc Date
4/22/2014
Section_Exhibit Name
Tables 2.1-1 to 4.1-5
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HYDRAULIC EXCAVATOR WORK <br />Task description: Recontour East Salt Creek Bridge Area <br />Site: McClane Canyon Mine Permit Action: MT7 <br />PROJECT IDENTIFICATION <br />Task #: 003 State: Colorado <br />Date: 12/30/2013 County: Garfield <br />User: ZTT <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 324D L 9' -8" Stick <br />Attachment l: ROPS Cab <br />Cost Breakdown: <br />Table 3.7 -1 Page 6 <br />Permit/Job#: C1980004 <br />Abbreviation: None <br />Filename: C004 -003 <br />Horsepower: <br />186 <br />Weight (MT): <br />24.85 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Load Bucket Caoaci <br />Bucket Size Class: Medium <br />Utilization % <br />Ownership Cost/Hour: <br />$31.12 <br />NA <br />Job Condition Correction Factors Site <br />Operating Cost/Hour: <br />$57.98 <br />100 <br />Altitude Adj: 1.00 (CAT HB) <br />Operator Cost/Hour: <br />$33.94 <br />NA <br />Net Correction: 0.83 multiplier <br />Total Unit Cost/Hour: <br />$123.05 <br />LCY/Hour <br />Total Fleet Cost/Hour: <br />$123.05 <br />Adjusted Hourly Fleet Production: 374.52 <br />MATERIAL QUANTITIES <br />JOB TIME AND COST <br />Initial volume: 50 <br />CCY Swell factor: <br />1.250 <br />Loose volume: 63 <br />LCY <br />Source of estimated volume: Division of Reclamation, Mining <br />& Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket <br />swing loaded, dump bucket, swing empttyl. <br />Basic Job Condition Description: <br />AVERAGE <br />Secondary <br />Job Condition within Basic Description: <br />AVERAGE <br />Cycle Time Value: <br />0.293 minutes <br />Load Bucket Caoaci <br />CIRCES Cost Estimating Software <br />Bucket Size Class: Medium <br />Rated Capacity: 2.26 LCY (heaped) <br />Bucket Fill Factor: 0.975 Sand and gravel (95% - 100 %) 0.975 <br />Adjusted Capacity: 2.20 LCY <br />Job Condition Correction Factors Site <br />Altitude: 5600 feet <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift/day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: 451.23 <br />LCY/Hour <br />Adjusted Hourly Unit Production: 374.52 <br />_ <br />LCY/Hour <br />Adjusted Hourly Fleet Production: 374.52 <br />LCY/Hour <br />JOB TIME AND COST <br />Fleet size: I Excavator Total job time: <br />0.17 Hours <br />Unit cost: $0.329 /LCY Total job cost: <br />$21.00 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.