Laserfiche WebLink
May 8, 2014 C- 1996 - 083 /Bowie No. 2 Mine SLB <br />Number of Partial Inspection this Fiscal Year: 16 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 8 of 16 <br />Gob Pile #2 — north edge of <br />pile where refuse meets <br />backslope. Additional <br />stripping will be required <br />before more material can be <br />placed in this area. <br />Gob Pile #2 interface of pile <br />with slope on northeast side. <br />Refuse material cannot be <br />placed any higher without <br />additional stripping measures. <br />