Laserfiche WebLink
5/13/2014 State.co.us Executive Branch Mail - Bowie No. 2 Mine C1996083 MR150- Comments Receivad <br />The plans have changed slightly in that two stations will be required. The locations are shown <br />in the attachment. I would say worst case would be five days of instream work for each <br />station. <br />The cutthroat species was misclassified several years ago based on incorrect baseline species <br />DNA data. The USFWS is aware of this. Attached are the most recent report and summary <br />clarifying the species confusion. Regardless, impacts to the stream have been kept to a <br />minimum and will remain that way for future projects. <br />Art Etter P.E. <br />Mining/Civil Engineer <br />(970) 929-5367 <br />Briar. Magee <br />Colorado Parks and Wildlife <br />970-375-6707 <br />Brian Magee <br />Colo-ado Parks and 'Wildl"fe <br />970-375-6707 <br />hftps://mail.gc)ogle.conVmai1/u/O/?ui=2&ik--e29129fcb5&viev�pt&search=inboy&th=145f6925cb726C)4a&siml=145f6925cb72604a 4/5 <br />