My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-13_REVISION - C1996083 (6)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-05-13_REVISION - C1996083 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:59 PM
Creation date
5/13/2014 1:04:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
5/13/2014
Doc Name
Comments Received
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
MR150
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5/13/2014 State.co.us Executive Branch Mail - Bowie No. 2 Mine C1996083 MR150- Comments Received <br />Burgmaier - DNR, Susan <susan.burgmaier @state.co.us> Tue, May 13, 2014 at 11:11 AM <br />To: AEtter @bowieresources.com, Bill Bear <BBear @bowieresources.com >, Jim Stover <jestover @bresnan.net> <br />Cc: Alysha Hernandez - DNR <alysha.hernandez @state.co.us> <br />Please see the comments (below) from Colorado Parks and Wildlife, which are being forwarded to you in <br />accordance with Rule 2.07.3(5). Please let me know if you will be sending revised pages for consideration under <br />M R -150. <br />Susan L. Burgmaier <br />„a v,,, , <br />Coal Regulatory Program <br />Department of Natural Resources <br />P 303,366,3567 x 3111 I F301832.8106 <br />1313 Sherman Street, Room 215, Denver, CO 30203 <br />susan.burgmaier@state , co,us I http : / /mining.state.co.us <br />Hi Susan- <br />We appreciate your efforts to include the needs of cutthroat trout during the permitting process. <br />CPW has reviewed the Memo dated 5/72014 by Resource Engineering, Inc., and the e-mail provided by Art Etter. <br />After discussing this further with the aquatic biologists, and given the requirements of the EA, we are okay with <br />working on the structures no later than June 15th, provided Bowie sticks to the 5 day construction window as <br />outlined in Art's e-mail. Although this may result in an overlap into the front end of spawning for cutthroat, we feel <br />that the effects should be minimal if they complete it within the five days as described. <br />We anticipate some local negative effects on this years recruitment, but since the population extends upstream <br />of the proposed work locations, upstream recruitment may help to reduce the effects of the in- stream work on the <br />lower stream segments. <br />As a final note, we would like stress the importance of getting it done sooner rather than waiting until near <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &viev�-- pt &search =i nbox&th= 145f6925cb72604a &si ml= 145f6925cb72604a 1/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.