cn
<br />m
<br />0
<br />c7
<br />U
<br />O
<br />x
<br />en
<br />rn
<br />o�
<br />0
<br />0.
<br />a
<br />i
<br />U
<br />O
<br />2
<br />O
<br />O
<br />x
<br />J
<br />O
<br />x
<br />w
<br />RECORD OF BOREHOLE MW -5
<br />SHEET of 2
<br />PROJECT: Boettcher Limestone Quarry DRILL METHOD: Hollow Stem Auger COORDINATES: DEPTH W.L.: 39.5 ft
<br />PROJECT NUMBER: 103- 81640A DATE/TIME STARTED: 12/12/2012 N: 1,489,893.21 E: 3,097,213.94 ELEVATION W.L.: 5234.5 ft
<br />LOCATION: Laporte, CO DRILLED DEPTH: 60.0 ft GS ELEVATION: 5274.0 ft INCLINATION: -90
<br />SOIL PROFILE
<br />SAMPLE INFORMATION
<br />Q
<br />U
<br />x
<br />w
<br />a
<br />W
<br />m
<br />w
<br />a s
<br />Q.
<br />LITHOLOGY DESCRIPTION
<br />0
<br />O
<br />BLOWS
<br />N
<br />Aft
<br />GAMMA
<br />w
<br />o
<br />Z
<br />per 6 in
<br />REMARKS
<br />(cps)
<br />w
<br />100 200 30
<br />0.0 - 3.2ft
<br />(ML) clay SILT, low plasticity, some fine to
<br />0.0 -2.0
<br />S -1
<br />SS
<br />14- 10 -11 -11
<br />21
<br />1.14
<br />coarse gravel, pale brown, dry, very stiff,
<br />2.00
<br />calcareous, cohesive
<br />2.0 -4.0
<br />S -2
<br />SS
<br />7 -7 -7 -8
<br />14
<br />2.04
<br />2.00
<br />3.2 - 5.4ft
<br />270
<br />(ML) SILT, dark gray, dry, calcareous
<br />5
<br />4.0 -6.0
<br />S -3
<br />SS
<br />12 -8-7 -8
<br />15
<br />5.4 - 10.Oft
<br />(ML) clayey SILT, low plasticity, some fine
<br />sand, yellow brown and gray orange, dry, firm
<br />to very soft, calcareous, cohesive
<br />6.0 -8.0
<br />S4
<br />SS
<br />5-4-4-6
<br />8
<br />2.00
<br />265
<br />8.0 -10.0
<br />S -5
<br />SS
<br />3 -2-4 -7
<br />6
<br />im
<br />2.00
<br />2.00
<br />1
<br />10.0 - 11.2ft
<br />(ML) SILT, dark gray, dry, calcareous
<br />10.0 -12.0
<br />S-6
<br />SS
<br />6- 6 -8 -15
<br />14
<br />1-54
<br />2.00
<br />11.2 - 14.0ft
<br />(ML) clayey SILT, low plasticity, some fine
<br />sand, gray orange, dry, firm, calcareous,
<br />>�
<br />cohesive
<br />12.0 -14.0
<br />S -7
<br />SS
<br />4 -3 -3 -2
<br />6
<br />2.00
<br />260
<br />14.0 - 20.4ft
<br />1
<br />(ML) SILT, some clay, dark gray, dry,
<br />14.0 -16.0
<br />S-8
<br />SS
<br />13- 11 -10 -11
<br />21
<br />134
<br />calcareous
<br />2.00
<br />16.0 -18.0
<br />S -9
<br />SS
<br />9 -9-10 -7
<br />19
<br />1�
<br />2.00
<br />18.0 -20.0
<br />S -10
<br />SS
<br />6-59-6
<br />14
<br />1?�
<br />2.00
<br />255
<br />z
<br />20.4 - 26.8ft
<br />20.0 -22.0
<br />S -11
<br />SS
<br />6 -5-4-4
<br />9
<br />1.60
<br />(ML) clayey SILT, low plasticity, trace fine
<br />2.00
<br />sand, gray orange, dry, firm to stiff, damp
<br />between 25 to 26.75, calcareous, cohesive
<br />22.0 -24.0
<br />S -12
<br />SS
<br />4 -4-4 -3
<br />8
<br />0 2 .0
<br />2.00
<br />250
<br />2
<br />24.0 -26.0
<br />S -13
<br />SS
<br />4 -3 -3 -8
<br />6
<br />2200
<br />28.0 -28.0
<br />S -14
<br />SS
<br />8 -16-28 -16
<br />44
<br />26.8 - 31.Oft
<br />(ML) SILT, light gray, dry, calcareous, wet 29
<br />to 29.5 feet
<br />245
<br />28.0 -30.0
<br />S -15
<br />SS
<br />7- 6 -12 -15
<br />18
<br />] �i
<br />2.00
<br />3
<br />30.0 -32.0
<br />S -16
<br />SS
<br />11- 8 -17 -16
<br />25
<br />2.00
<br />31.0 - 32.1ft
<br />(ML) SILT, low plasticity, trace fine sand, dark
<br />gray, dry, very stiff, calcareous and cohesive
<br />32.0 -34.0
<br />S -17
<br />SS
<br />11 -16 -13-10
<br />29
<br />�
<br />2.00
<br />32.1 - 35.2ft
<br />(ML) SILT, low plasticity, trace clay, trace fine
<br />240
<br />sand, yellow brown and gray orange, dry, very
<br />stiff to stiff, cohesive
<br />3
<br />34.0 -36.0
<br />S -18
<br />SS
<br />4 -3-"
<br />9
<br />2.000
<br />35.2 - 37.2ft
<br />(ML) clayey SILT, low plasticity, trace fine
<br />sand, dark yellow brown, moist, stiff, cohesive
<br />1.34
<br />36.0 -38.0
<br />S -19
<br />SS
<br />7 -5-55
<br />10
<br />2,00
<br />37.2 - 37.4ft
<br />(ML) SILT, light olive gray, wet, calcareous
<br /><< Continued>>
<br />235
<br />380100
<br />S -20
<br />SS
<br />2-34-6
<br />7
<br />1$4
<br />2.00
<br />1 39.45ft 11/29/2012
<br />4
<br />of
<br />M
<br />DRILLING CONTRACTOR: Precision Sampling
<br />1 DRILLER: Mclnroy
<br />o DRILL RIG: CME 55
<br />x
<br />LOGGED BY: Krambis
<br />CHECKED BY: A. Hobson Golder
<br />DATE: (Associates
<br />
|