My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-05_HYDROLOGY - M1977348
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977348
>
2014-05-05_HYDROLOGY - M1977348
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:45 PM
Creation date
5/13/2014 9:51:42 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977348
IBM Index Class Name
HYDROLOGY
Doc Date
5/5/2014
Doc Name
Groundwater characterization report
From
Golder Associates
To
DRMS
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 2014 1 10381640A <br />1.0 INTRODUCTION <br />Golder Associates Inc. (Golder) is pleased to submit this groundwater characterization report (Report) to <br />the State of Colorado Division of Reclamation, Mining and Safety (DRMS) on behalf of Holcim (US) Inc. <br />(Holcim) concerning the former Boettcher Limestone Quarry (Site) in Laporte, Colorado. A DRMS letter <br />dated June 25, 2012 (DRMS 2012) described review of the analytical results reports for the March 2011 <br />through March 2012 quarterly sampling events at the Site. In the review, the DRMS noted consistent <br />benchmark exceedances of barium in groundwater concentrations for two of four monitoring wells present <br />at the Site, consistent benchmark exceedances of total dissolved solids (TDS) in one well, and minor <br />MCL (maximum contaminant level) exceedances of boron in one well. The DRMS requested that Holcim <br />address questions associated with the nature and extent of groundwater impacts from the Site (if any), <br />the influence of hydrogeological conditions on groundwater and constituent transport, and potential <br />receptors hydraulically downgradient from the Site. <br />Holcim and Golder submitted to the DRMS a Groundwater Characterization Plan dated October 23, 2012 <br />(Golder 2012) that details the planned approach to addressing the DRMS questions. This Report <br />describes the methodology and findings of the Groundwater Characterization Plan implementation <br />program. Based on these findings, this Report also addresses the questions presented in the June 25, <br />2012 DRMS letter and recommends a path forward to achieving full release of reclamation liability for the <br />Site in accordance with Section 3.1.7 of the Construction Materials Rule. <br />01""01 Golder <br />i. \10 \81640x1 0400\ gwcharwellinstallfieltlrep _fnl- 30apr14 \10381640a gwcharrpt _holcim- boettcher_fnl- 28apr1d- with holcim edits.docx <br />Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.