Laserfiche WebLink
April 2014 <br />10381640A <br />5.1.4 Conclusions and Recommendations ...................................................... ............................... 25 <br />6.0 REFERENCES .................................................................................................. .............................27 <br />List of Tables <br />Table 1 <br />Monitoring Well Construction Summary <br />Table 2 <br />Hydraulic Testing Results Summary <br />Table 3 <br />Summary of Monitoring Results for MW -1 <br />Table 4 <br />Summary of Monitoring Results for MW -2 <br />Table 5 <br />Summary of Monitoring Results for MW -3 <br />Table 6 <br />Summary of Monitoring Results for MW -4 <br />Table 7 <br />Summary of Monitoring Results for MW -5 <br />Table 8 <br />Summary of Monitoring Results for MW -6 <br />Table 9 <br />Summary of Monitoring Results for MW -7 <br />Table 10 <br />2012 Whole Rock Acid Digestion Results <br />Table 11 <br />Summary Statistics for Historic Whole Rock Analysis of CKD <br />Table 12 <br />Secor and 2012 Synthetic Precipitation Leaching Procedure Results <br />Table 13 <br />Estimated Groundwater Travel Times <br />List of Figures <br />Figure 1 <br />Site Location Plan <br />Figure 2 <br />Stratigraphic Section of Boettcher Quarry Area <br />Figure 3 <br />Generalized Cross Section <br />Figure 4 <br />Piper Diagram of Groundwater Results <br />Figure 5 <br />Schoeller Diagram of Whole Rock Acid Digestion: Major Ions and Iron <br />Figure 6 <br />Schoeller Diagram of Whole Rock Acid Digestion: Trace Metals <br />Figure 7 <br />Schoeller Diagram of SPLP Results: Major Ions and Iron <br />Figure 8 <br />Schoeller Diagram of SPLP Results: Trace Metals <br />Figure 9 <br />Groundwater Elevations vs. Time <br />List of Appendices <br />Appendix A Historic CKD, TCLP, and Solids Analysis <br />Appendix B Lithology Logs for MW -1 through MW -3 <br />Appendix C Well Construction and Borehole Logs for the 2012 Investigation <br />Appendix D Concentration vs. Time Plots <br />Figure D -1 <br />Dissolved Arsenic <br />Figure D -2 <br />Dissolved Barium <br />Figure D -3 <br />Dissolved Boron <br />Figure D -4 <br />Dissolved Chromium <br />Figure D -5 <br />Dissolved Copper <br />Figure D -6 <br />Dissolved Iron <br />Figure D -7 <br />Dissolved Lead <br />Figure D -8 <br />Dissolved Manganese <br />Figure D -9 <br />Dissolved Selenium <br />Figure D -10 <br />Dissolved Thallium <br />Figure D -11 <br />Dissolved Zinc <br />Figure D -12 <br />Total Dissolved Solids <br />Figure D -13 <br />pH <br />Golder <br />I: \10 \81640a\ 0400\ gv charvrellinslaltfieltlrep _fnl- 30apr14 \10381640a gwcharrpt _holcim- bcettcher_fnl- 28apr14- vnth holcim edits.docx 9 Associates <br />W <br />