My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-13_REVISION - C1996083 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2014-05-13_REVISION - C1996083 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:43:59 PM
Creation date
5/13/2014 9:14:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
5/13/2014
Doc Name
Adequacy Review Response (Emailed)
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
MR150
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flume installation, removal or any other in- stream work will not take place <br />between June 1 st and September 1 st. In addition, heavy equipment heavy <br />equipment, hand tools, boots and any other equipment that was previously <br />used in a river, stream, lake, pond, or wetland will be disinfected prior to <br />moving the equipment to another water body to avoid spreading <br />aquatic nuisance species and fish parasites. The disinfection practice should <br />follow this outline: <br />Remove all mud and debris from equipment and spray /soak equipment with <br />a 1:15 solution of disinfection solution containing the following ingredients: <br />• Dialkyl dimethyl ammonium chloride, 5 -10% by weight; <br />• Alkyl dimethyl benzyl ammonium chloride, 5 -10% by weight; <br />• Nonyl phenol ethoxylate, 5 -10% by weight; <br />• Sodium sesquicarbonate, 1 -5 %; <br />• Ethyl alcohol, 1 -5 %; and <br />• Tetrasodium ethylene diaminetetraacetate, 1 -5 %; <br />• and water, keeping the equipment moist for at least 10 minutes and <br />managing rinsate as a solid waste in accordance with local, county, <br />state, or federal regulations; or <br />• Spray /soak equipment with water greater than 140 degrees <br />Fahrenheit for at least 10 minutes and <br />• Sanitize water suction hoses and water transportation tanks (using <br />methods described above) and discard rinse water at an appropriately <br />permitted disposal facility. <br />The flumes will be installed under Corps nationwide Permit Number 5 <br />(NWP -5). Installation of small weirs and flumes constructed primarily to <br />record water quantity and velocity are preapproved by the Corps provided <br />the discharge is limited to 25 cubic yards. There is no preconstruction <br />notification required for NWP -5. <br />PR -14 2.05-133 05/12/14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.