Laserfiche WebLink
PROPERTY LINE AND PERMIT BOUNDARY <br />100 YR FLOODPLAIN <br />DITCH <br />LIMITS OF MINING AREAS <br />—4W40— EXISTING 2' CONTOURS <br />OMINING SEQUENCE <br />TEMPORARY SCREENING BERM <br />TO BE REMOVED UPON <br />COMPLETION OF MINING <br />Q Q ON SITE HAUL ROAD /CONVEYOR <br />PROPOSED ACCESS <br />POTENTIAL FUTURE OIL /GAS <br />WELL LOCATIONS <br />POTEN P AL FUTURE OIL /GAS <br />PRODUCTION FACILITY <br />r_ r_ POSSIBLE LOCATION OF FUTURE <br />OIL & GAS ACCESS ROAD <br />NW CORNER, — <br />SE 1/4, NE 1/4, <br />SEC 2, T2N, <br />R68W // <br />20' UnOTY tr <br />IRRIGATION <br />EASEMENT <br />30' ROW RESERVATICN <br />FOR WEER 9 3/4 <br />POTENTIAL FUTURE LOCATION OF KERR -MCGEE OIL & GAS <br />OPERATIONS AREA FOR HELL AND ACCESS ROAD <br />POTENTIAL FUTU RE LOCATION OF KERR-MFCEtl <br />OK & GAS PIPE <br />POTENTIAL LOCATION OF OF 30' <br />NON - EXCLUSIVE OIL & GAS EAAYCNT —\ <br />PREFERRED FUTURE KERR- McGEE OPERATIONS AREA <br />ACCESS LOCATION _ <br />EXISTING — <br />60 ROW_ <br />POTENTIAL FUTURE LOCA7ION OF KERR -MCGEE OPERATION <br />AREA FOR PRODUCTION FAOLITY <br />NW CORNER, ­, E 1/2, SE 1/4, <br />SEC 2. T2N, <br />R68W <br />PROCESS AREA LAYOUT IS SHOWN FOR <br />REFERENCE ONLY STRUCTURES MAY NOT <br />BE SHOWN IN EXACT LOCATIONS <br />ALTERNTE FUTURE <br />KERB - MCCEE OPERATIONS <br />AREA ACCESS ROAD <br />50' ACCESS <br />29- RCP <br />CULVERT <br />LANDSCAPE - <br />SUPPLY AND <br />SALES AREA <br />MATERIAL <br />STOCKPILE <br />CHEMICAL DUST CONTROL OF <br />WCR 9 3/4 TO SITE ACCESS <br />POTENTIAL LOCATI ON OF <br />OF 30 NON - EXCLUSIVE <br />OIL&GAS EASEMENT - <br />POTENTIAL FUTURE LOCATION <br />OF KERR - MCEE OIL &GAS PIPE <br />POTENTIAL FUTURE <br />LOCATION OF KERR -MCGEE <br />OIL & GAS OPERATIONS <br />AREA FOR WELL AN0 <br />ALTERNATE ACCESS ROAD — <br />PREFERRED FUTURE KERB -MCGEE DINERATIONS <br />AREA ACCESS LOCATION <br />100 YR <br />FLOOD <br />LIMITS <br />X <br />EXISTING OIL /GAS <br />FLOOD <br />WELL LOCATIONS <br />_ <br />EXISTING OIL /GAS <br />60 ROW <br />PRODUCTION FACILITY <br />25 IRRIGATION <br />DIRECTION OF MINING <br />— — <br />SECTION LINE/ L C <br />RANVEDTEMPORARY PUML DITCH <br />EDGE OF UNPAVED ROAD <br />— <br />r <br />EXISTING ROAD R O W <br />25.W MINING OFFSET <br />PROPOSED ROAD R 0 W <br />DITCH CROSSING <br />SLURRY WALL <br />G <br />POSSIBLE LOCATION OF FUTURE <br />1 <br />OIL AND GAS PIPE <br />60• IRRGARON <br />POSSIBLE LOCATION OF FUTURE <br />& MAINTENANCE <br />OIL & GAS NON- ECLUSIVE EASEMENT <br />100 YR <br />RICHARD & MARGARET VOGL <br />FLOOD <br />ACCT 1 e4786386 <br />LIMITS <br />PARCEL 1 120736000051 <br />60 ROW <br />BLASE I <br />25 IRRIGATION <br />25' SLURRY WALL OFFSET FROM DITCH EASEMENT. — <br />EASEMENT <br />WELD CO ROAD 24 <br />RANVEDTEMPORARY PUML DITCH <br />RELOCATION EASEMENT, SEE NOTE 14 <br />— <br />r <br />SLURRY <br />25.W MINING OFFSET <br />W <br />DITCH CROSSING <br />O <br />TOY IT , UKASE LSE STINAR V <br />—2I' R 0 W SETBACK <br />ACCT A 8557 <br />1 <br />24 7 ACRES+/ - <br />60• IRRGARON <br />25' SLURRY WALL PROPERTY LINE SETBACK <br />& MAINTENANCE <br />TEMPORARY <br />EASEMENT <br />RURAL DITCH <br />TION OF <br />CROSSING <br />ERY-M <br />OPERATIONS <br />cGEE <br />POSSIBLE ALIGNMENT OF <br />LANG RM - <br />RURAL DITCH LATERAL <br />R68W <br />ESS <br />PRIOR REVISIONS BY TETRATECH RMC <br />MIRING <br />25' YOUNG SETBACK <br />UK <br />�Cc <br />150' <br />SETBACK <br />SLURRY <br />WALL <br />SW CORNER 15 UTILITY I/ <br />SEC 2, T2N, & DRAINAGE Jy <br />R68W EASEMENT <br />SIN CORNER 30' R 0 W RESERVATION <br />E 1/2 SE 1/4 FOR MICR 24 <br />SEC 2. T2N, <br />R68W <br />LT BASIN <br />+ / -11 ACRES <br />POTENTIAL LOCATION OF <br />OF 30' NON - EXCLUSIVE <br />OIL &GAS EASEMENT — <br />POTENDAL FUTURE LOCATION <br />OF KERR -MCGEE OIL k -GAS PIPE <br />23 ACRESf + +/ /(- <br />RURAL DITCH LATERAL 150' <br />TO BE RELOCATED <br />SEE NOTE 3 RR- <br />GEE <br />TEMPORARY <br />GODDING <br />HOLLOW / <br />DITCH <br />CROSSING <br />/ / <br />R ENARD IT MARGARET VOGL <br />ACCT # IT 7865N <br />PARCEL I 120736000D52 <br />SECTION UNE <br />— �PkOPERTY LINE — <br />EK. LA5I CHANCE IRRIGATION DITOI, [% <br />L— RELOCATE PRIOR TO CONSTRUCTION, <br />R7511 . <br />RICHARD & MARGARET VOGL <br />�SURRY WKSE2TOBENNB7S- <br />ACCT 1 e4786386 <br />- WALL IDACVES ATAIME <br />PARCEL 1 120736000051 <br />+/ -16.9 ACRES <br />BLASE I <br />NUNNG <br />25' SLURRY WALL OFFSET FROM DITCH EASEMENT. — <br />UMRS <br />PLANNED 35' LAST CHANCE DITCH <br />RANVEDTEMPORARY PUML DITCH <br />RELOCATION EASEMENT, SEE NOTE 14 <br />CROSSING, PERMISSION FROM DITCH <br />0 <br />COMPANY POOR TO CONSTRUCITM OF <br />MINING <br />DITCH CROSSING <br />O <br />TOY IT , UKASE LSE STINAR V <br />I <br />ACCT A 8557 <br />PIPE <br />OIL &GAS PIPE <br />OIL <br />PARCEL I 131 }p1 D000i6 3 <br />1313 <br />6 <br />25' SLURRY WALL PROPERTY LINE SETBACK <br />POEM <br />' SEE <br />NE CORNER, <br />7 <br />SW 1/4, NW 1/4, <br />TION OF <br />SEC 1, T2N, 68W <br />NE CORNER, <br />OPERATIONS <br />SE 1/4, NE 1/4, <br />POSSIBLE ALIGNMENT OF <br />SEC 2. T2N <br />RURAL DITCH LATERAL <br />R68W <br />SEE NOTE 3 <br />POTENTIAL LOCATION OF <br />OF 30' NON - EXCLUSIVE <br />OIL &GAS EASEMENT — <br />POTENDAL FUTURE LOCATION <br />OF KERR -MCGEE OIL k -GAS PIPE <br />23 ACRESf + +/ /(- <br />RURAL DITCH LATERAL 150' <br />TO BE RELOCATED <br />SEE NOTE 3 RR- <br />GEE <br />TEMPORARY <br />GODDING <br />HOLLOW / <br />DITCH <br />CROSSING <br />/ / <br />R ENARD IT MARGARET VOGL <br />ACCT # IT 7865N <br />PARCEL I 120736000D52 <br />SECTION UNE <br />— �PkOPERTY LINE — <br />EK. LA5I CHANCE IRRIGATION DITOI, [% <br />L— RELOCATE PRIOR TO CONSTRUCTION, <br />R7511 . <br />lf/ <br />�SURRY WKSE2TOBENNB7S- <br />100 <br />- WALL IDACVES ATAIME <br />CENTERLNE CONTOL <br />+/ -16.9 ACRES <br />BLASE I <br />NUNNG <br />10 BE MUD 5.10 <br />ACRE ATA TIME <br />UMRS <br />25 GASLINE 25'MINNG SETBACK <br />RANVEDTEMPORARY PUML DITCH <br />+ / -15.1 ACRES <br />CROSSING, PERMISSION FROM DITCH <br />0 <br />COMPANY POOR TO CONSTRUCITM OF <br />MINING <br />DITCH CROSSING <br />LIMITS <br />I <br />$WARY <br />WALL <br />cA]I <br />DIES O •PHASES 4 <br />WASH DISCHARGE <br />PONDS PANT /I <br />19 ACRES + /— <br />SETTLING <br />POND <br />LOT A <br />PRIMA <br />TE <br />\\ <br />/ <br />CHEMICAL L <br />CK <br />100 <br />j <br />CENTERLNE CONTOL <br />1 <br />/ OF ITT EE NOTE A10 <br />RURAL D1i01 <br />FLOO <br />LIMIT <br />65' DITCH SETBACK <br />LIMITS <br />25 GASLINE 25'MINNG SETBACK <br />CWDING HOLLOW OIll3N <br />SE 'SACK FROM SLURRY WALL <br />9/10/02 <br />0 <br />NORM SIDE OF PHASE 8 <br />SETTLING <br />10/16/02 <br />AL LOCATION OF KERB -MCGEE <br />/ <br />OF EXIST XERR-McGEE WE <br />PIPE <br />OIL &GAS PIPE <br />OIL <br />/ <br />6 <br />WITHOUT PRIOR AUTHORIZATION BY THE US ARMY <br />POEM <br />' SEE <br />POINT #2 <br />7 <br />POTENTIAL FUTURE LOCO <br />TION OF <br />POTENTIAL LOCATION OF OF 30 60' RIBGAiION <br />KEW -MCGEE OIL & GAS <br />OPERATIONS <br />NON - EXCLUSIVE OIL &GAS & YANIENARCE <br />AREA FOR WELL AND A <br />( ;ESS ROAD <br />EASEMENT ,,V EASEMENT <br />cA]I <br />DIES O •PHASES 4 <br />WASH DISCHARGE <br />PONDS PANT /I <br />19 ACRES + /— <br />SETTLING <br />POND <br />LOT A <br />PRIMA <br />TE <br />\\ <br />4 &J 1 <br />GODD/NG DITCH <br />(HIGHLAND SOUTH <br />100 <br />R <br />0 <br />1 <br />60 ROW ILL <br />FLOO <br />LIMIT <br />1'=300' <br />LIMITS <br />ACTIVITIES OR UNDER RECLAMATION PALL BE <br />CWDING HOLLOW OIll3N <br />MAINTAINED AS PASTURE OR OTHER SUITABLE <br />9/10/02 <br />0 <br />4 <br />SETTLING <br />10/16/02 <br />AN AGREEMENT HAS BEEN REACHED WITH THE <br />5 <br />OF EXIST XERR-McGEE WE <br />POND DISCHARGE <br />4 NO AIRISDICITIONAL WETLANDS TO BE DISTURBED <br />6 <br />WITHOUT PRIOR AUTHORIZATION BY THE US ARMY <br />1/36/03 <br />POINT #2 <br />7 <br />5 GRAVEL MINING OPERA71ONS IN PHASE 9 WILL <br />2/26/03 <br />25 LAIN <br />BOOK 525 <br />pLREeEPTION <br />SLURRY <br />'ALL <br />COLONY <br />SLURRY WALL <br />_ <br />MAXIMUM DISTANCES MINING MAY OCCUR CLOSER TO <br />PRIOR REVISIONS BY TETRATECH RMC <br />TO WELL <br />25' YOUNG SETBACK <br />5 <br />150' <br />SETBACK <br />SOUTH SLURRY MID R WALL <br />SIDETII AMP ASE <br />I SIDES CE PHASE 8 <br />+/- 39.4 ACRES <br />A <br />s� <br />25 TCH <br />SETBACK , <br />cA]I <br />DIES O •PHASES 4 <br />WASH DISCHARGE <br />PONDS PANT /I <br />19 ACRES + /— <br />SETTLING <br />POND <br />LOT A <br />PRIMA <br />TE <br />\\ <br />North <br />GODD/NG DITCH <br />(HIGHLAND SOUTH <br />\VI <br />SIDE) <br />0 300 <br />60 LAST <br />SCALE: <br />2 <br />1'=300' <br />CO ROAD 24 <br />AJ ^ I I `SE CORNER <br />SEC 2, T2N, <br />R68 <br />Q R68W <br />Qz <br />60' R 0 W FOR ' <br />IRNGATI(1N pT01 / <br />25 FOR <br />SE j_ <br />PRIMA <br />150 <br />SETBACK <br />SIMILE AREA <br />200' MINING SETBACK <br />UNDISTURBED <br />AREA <br />PEUCAN SNORES 5 HOMEOWNERS <br />ASSOCIATION <br />ACCT I R335M <br />PARCEL F 120736401028 WELD CO. ROAD 26 <br />-D. LOCATION RURAL DITCH RETURN <br />35' LAST CHANCE DITCH RELOCATION <br />PLANNED EASEMENT <br />-UNIT OF DRAINAGEWM <br />-40.0• DISTANCE FROM DRAINAGEWAY EDGE TO WEST SIDE OF PLANNED RURAL DITCH EASEMENT <br />1200' PUNNED DRAINAGEWAY LINDA J JAMISON <br />ACCT I R0068688 <br />—20 0' PUNNED PARCEL 1 131301000047 <br />RURAL DITCH RETURN <br />-25.0' MINING UMIT FROM SLURRY WALL <br />SEE NOTE $12 POSSIBLE ALIGNMENT OF <br />RURAL DITCH, OPEN CHANNEL <br />OR PIPE SEE NOTE 3 <br />NE CORNER, <br />SE 1/4, NW 1/4, <br />SEC 1, T2N R68W DISCHARGE <br />40' NRRIGATON POINT A4 <br />tr YANTENUICE SETTLING <br />EA eMENi POND <br />• 3s 25' DITCH 48N <br />SETBACK <br />/ <br />SLURRY <br />TEMPORARY COLE DITCH WALL <br />CROSSING OPERATOR <br />WILL OBTAIN PERMISSION 40 MINING SETBACK 1 <br />FROM DITCH COMPANY PROW UD NAIL <br />PRIOR TO CONSTRUCTION NORTH SIDE aF PHASE 9 <br />\ <br />ITCH CROSSING <br />L RURAL DITCH <br />DITCH TO BE <br />RELOCATED SEE <br />NOTE 3 <br />37 7 ACOE�% 1 <br />/ a <br />SO YINNG SETBACK / AE <br />50' SLURRY WALL <br />SIDES ANO EAST <br />\` vas a PHASE 9 <br />McCORMICK DITCH <br />DITCH TO BE <br />RELOCATED SEE <br />CLOTF i _ SLUM <br />WALL <br />4W36 —4840 <br />gay AWE <br />POSSIBLE ALIGNMENT OF <br />CENTER 1/4 McCORMICK DITCH, OPEN <br />CORNER, CHANNEL OR PIPE OPERATOR <br />SEC 1, T214, WILL OBTAIN PERMISSION <br />R68W FROM DITCH CO PRIOR TO <br />DITCH ALTERATION <br />NOTES <br />DESCRIPTION <br />1 FLOODPLAIN INFORMATION IS FROM FIRM FLOOD <br />\VI <br />00 YR <br />INSURANCE RATE MAP, PANEL NO 080266 0855 C. <br />60 LAST <br />FLOOD <br />2 <br />CHANCE <br />"TC <br />LIMITS <br />ACTIVITIES OR UNDER RECLAMATION PALL BE <br />ROW <br />/ <br />MAINTAINED AS PASTURE OR OTHER SUITABLE <br />9/10/02 <br />COVER CROP UNTIL MINING BEGINS IN EACH PHASE <br />4 <br />�AIPROX LOCATION <br />10/16/02 <br />AN AGREEMENT HAS BEEN REACHED WITH THE <br />5 <br />OF EXIST XERR-McGEE WE <br />1/28/03 <br />4 NO AIRISDICITIONAL WETLANDS TO BE DISTURBED <br />6 <br />WITHOUT PRIOR AUTHORIZATION BY THE US ARMY <br />1/36/03 <br />'1 <br />7 <br />5 GRAVEL MINING OPERA71ONS IN PHASE 9 WILL <br />2/26/03 <br />COMMENCE BETWEEN NOVEMBER 1 - FEBRUARY 28 <br />BOOK 525 <br />pLREeEPTION <br />COLONY <br />_ <br />MAXIMUM DISTANCES MINING MAY OCCUR CLOSER TO <br />PRIOR REVISIONS BY TETRATECH RMC <br />OIL AND GAS STRUCTURES CONSISTENT WITH AGREEMENTS <br />BETWEEN THE PARTIES AND /OR THE STABILITY ANALYSIS <br />37 7 ACOE�% 1 <br />/ a <br />SO YINNG SETBACK / AE <br />50' SLURRY WALL <br />SIDES ANO EAST <br />\` vas a PHASE 9 <br />McCORMICK DITCH <br />DITCH TO BE <br />RELOCATED SEE <br />CLOTF i _ SLUM <br />WALL <br />4W36 —4840 <br />gay AWE <br />POSSIBLE ALIGNMENT OF <br />CENTER 1/4 McCORMICK DITCH, OPEN <br />CORNER, CHANNEL OR PIPE OPERATOR <br />SEC 1, T214, WILL OBTAIN PERMISSION <br />R68W FROM DITCH CO PRIOR TO <br />DITCH ALTERATION <br />NOTES <br />NO <br />DESCRIPTION <br />1 FLOODPLAIN INFORMATION IS FROM FIRM FLOOD <br />\VI <br />1 <br />INSURANCE RATE MAP, PANEL NO 080266 0855 C. <br />9/28/98 <br />DATED SEPTEMBER 28, 1982 <br />2 <br />2 ALL AREAS NOT DISTURBED BY CURRENT MINING <br />1/22/01 <br />ACTIVITIES OR UNDER RECLAMATION PALL BE <br />3 <br />MAINTAINED AS PASTURE OR OTHER SUITABLE <br />9/10/02 <br />COVER CROP UNTIL MINING BEGINS IN EACH PHASE <br />4 <br />3 NO IRRIGATION DITCHES WILL BE DISTURBED UNTIL <br />10/16/02 <br />AN AGREEMENT HAS BEEN REACHED WITH THE <br />5 <br />IRRIGATION COMPANY <br />1/28/03 <br />4 NO AIRISDICITIONAL WETLANDS TO BE DISTURBED <br />6 <br />WITHOUT PRIOR AUTHORIZATION BY THE US ARMY <br />1/36/03 <br />CORPS OF ENGINEERS <br />7 <br />5 GRAVEL MINING OPERA71ONS IN PHASE 9 WILL <br />2/26/03 <br />COMMENCE BETWEEN NOVEMBER 1 - FEBRUARY 28 <br />IN AN EFFORT TO PROTECT THE BURROWING OWL <br />COLONY <br />6 OIL AND GAS SETBACKS TO MINING AS SHOWN ARE <br />MAXIMUM DISTANCES MINING MAY OCCUR CLOSER TO <br />PRIOR REVISIONS BY TETRATECH RMC <br />OIL AND GAS STRUCTURES CONSISTENT WITH AGREEMENTS <br />BETWEEN THE PARTIES AND /OR THE STABILITY ANALYSIS <br />NO <br />DESCRIPTION <br />DATE <br />BY <br />1 <br />REVISED <br />9/28/98 <br />SLR <br />2 <br />AMENDMENT <br />1/22/01 <br />SLR <br />3 <br />AMENDMENT <br />9/10/02 <br />SLR <br />4 <br />AMENDMENT <br />10/16/02 <br />SLR <br />5 <br />Du &Gas /STABIUTY <br />1/28/03 <br />KGF <br />6 <br />KERR -MCGEE WELLS <br />1/36/03 <br />KGF <br />7 <br />MLRB HEARING <br />2/26/03 <br />KGF <br />7 THE APPROPRIATE OIL AND GAS COMPANY WILL BE RESPONSIBLE <br />FOR CONSTRUCTION AND MAINTENANCE OF ACCESS ROADS <br />CONSTRUCTED TO ACCESS GAS AND OIL FACILITIES IF <br />A DITCH CROSSING 15 NECESSARY, THE OIL AND GAS COMPANY <br />IS RESPONSIBLE FOR OBTAINING PERMISSION, CONSTRUCTION, <br />AND MAINTENANCE OF THE CROSSING <br />8 ALL OIL AND GAS EASEMENTS AS SHOWN, ARE POSSIBLE <br />FUTURE NON - EXCLUSIVE EASEMENTS <br />9 20' WADE ROW EASEMENT, BOOK ell/RECEPTION #1532566 <br />10 POTENTIAL FUTURE LOCATION OF KERR -MCGEE OIL & GAS <br />OPERATIONS AREA FOR WELL AND ACCESS ROAD <br />O BOOK 502 <br />RECEPTION NO 1425433 <br />E 1/4 CORNER <br />SEC 1, T2N, <br />R68W <br />GRAVEL MINING OPERATOR - APPLICANT <br />MARK JOHNSON <br />BESTWAY CONCRETE & AGGREGATES <br />301 CENTENNIAL DRIVE <br />MILLIKEN, COLORADO 80543 <br />CIVIL RESOURCE LLC NOTES: <br />11. TETRATECH RMC PREPARED MINING PLAN FOR PHASES 1 THROUGH 9. CIVIL RESOURCES, LLC <br />ADDED PHASES 10 AND 11 TO THIS PLAN. TETRATECH NOTE STYLE. ALL CIVIL RESOURCE NOTES <br />IN TEXT STYLE VERDANA <br />12. PRIOR TO DESIGN OF SLURRY WALL, OWNER TO PERFORM FINAL SLOPE STABILITY ANALYSIS TO <br />DETERMINE MINING SETBACK FROM SLURRY WALL. <br />13. PRIOR MINE PLAN LINE WORK PROVIDED ELECTRONICALLY BY TETRATECH RMC. EXISITNG <br />CONDITIONS, SECTION LINES, AND PROPERTY BOUNDARY FOR MINE AREAS 1 THROUGH 9 <br />PROVIDED ELECTRONICALLY BY JP CIVIL LLC. <br />14. STRIPPING & OVERBURDEN /TOPSOIL STOCKPILE WILL OCCUR PRIOR TO LAST CHANCE AND <br />RURAL DITCH RELOCATION TIMING. DITCH EASEMENT WIDTH AND FINAL DITCH CROSS <br />SECTIONS DEPENDENT UPON AGREEMENTS WITH DITCH COMPANIES. <br />15. ACCESS TO KERR -MCGEE BURCH WELL SITE DEPENDANT UPON NEGOTIATIONS WITH WELL <br />OWNER, ACTUAL FLOWLINE LOCATIONS, AND FINAL SLOPE STABILITY ANALYSIS. MINING AND <br />RECLAMATION AROUND WELL PAD TO FOLLOW STANDARD PROCEDURES AND SURFACE USE <br />AGREEMENTS. <br />DRMG M -1998 -013 <br />BESTWAY CONCRETE & AGGREGATES <br />REVISIONS <br />NO DESCRIPTION <br />DATE <br />BY <br />THE SHORES - BURCH PROPERTY <br />FIRESTONE, COLORADO <br />MINING PLAN AMENDMENT <br />I EXPAND AREAS 10 &11 NORTH <br />7/2707 <br />BIT <br />/+ 323 5th Street <br />CIVIL R E S-SOU R C E SA LLC P.0 Box 6811 Frederick, CO 80530 <br />303 833 1416 (P) 303 833 2850 TO <br />2 ODP /CUP COMMENTS <br />tl /ou /o7 <br />ARR <br />3 ODP /CUP COMMENTS <br />1124/o6 <br />SKF <br />4 DBMS SUBMITTAL <br />V2VH <br />ARR <br />DESIGNED BY' DO <br />DRAWN BV• 69 <br />CHECKED BY ARR <br />DATE IAN. 2014 <br />SCALE. AS NOTED <br />I <br />108 NO <br />DWG <br />CR MInIn9J�MEND_3_5- 23 -0]tlwg <br />5 DRUMS SUBMITTAL (comments) <br />4,2VI4 <br />ARR <br />SHEET. <br />20F2 <br />