Laserfiche WebLink
EXHIBIT D — MINING PLAN - UPDATE 5 -2014 <br />This information provided in this Exhibit is intended to satisfy the requirements outlined in Section <br />6.4.4 of the Colorado Mined Land Reclamation Board Construction Material Rules and <br />Regulations: <br />(a) Description of the method(s) of mining to be employed in each stage of the <br />operation as related to any surface disturbance on affected lands; <br />The proposed permit area includes a significant deposit of sand and gravel located in <br />the alluvium of the Saint Vrain River in Weld County. The site is located north of Weld <br />County Road 24 /Highway 119 and east of Weld County Road 9.75. It encompasses <br />eight parcels totaling approximately 370.1 acres. This Amendment specifically <br />includes approximately 60.3 acres in the southeast comer of Weld County Road 11.25 <br />and Weld County Road 26. <br />Site Preparation: <br />Initial disturbance of the property will include: clearing the site of existing structures <br />(with exception of the structures to remain), constructing the slurry wall, dewatering the <br />site, and stripping the topsoil and overburden material. <br />Mining: <br />After the slurry wall installation, dewatering trenches will be excavated down to <br />bedrock to dewater the portion of the site located within the slurry wall. Groundwater <br />collected in the dewatering trench will be pumped into a settling pond and ultimately <br />discharged to Tri -Town Drainage located on the east end of the property that drains to <br />the Saint Vrain River. Once water levels are controlled through the dewatering <br />system, scrapers will strip the topsoil and overburden material from a given phase and <br />stockpile them separately for use during site reclamation. Any excess material not <br />needed for reclamation may be sold or hauled off -site during the life of the mine. <br />The sand and gravel material will be excavated down to bedrock. Each phase will be <br />dry-mined using scrapers, bulldozers, front -end loaders, excavators, or similar <br />equipment. The mining on this site will progress in two phases, ranging in size from <br />21 -22 acres and proceeding from east to the west. <br />The operator will develop and comply with a Stormwater Management Plan and Spill, <br />Prevention, Control and Countermeasures Plan. The operator will notify the Division <br />of Mine Safety and Reclamation in the event of a reportable spill. <br />Processing: <br />All material mined under this proposed application will be transported by conveyor or <br />haul truck to the processing area. <br />Import Material: <br />Bestway Concrete & Aggregates may import material from and export material to other <br />sites. The applicant is aware that in accordance with Rule 3.1.5(9) of the Construction <br />Bestway Concrete & Aggregates —The Shores -Burch Property — MLRB 112 Permit Application <br />Exhibit D -1 <br />