My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-05-08_REVISION - M1985022
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1985022
>
2014-05-08_REVISION - M1985022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:21:06 PM
Creation date
5/9/2014 9:47:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1985022
IBM Index Class Name
REVISION
Doc Date
5/8/2014
Doc Name
Transfer of permit and succession of operator approval and request for financial warranty SO02
From
DRMS
To
Eagle Peak Mining LLC
Type & Sequence
SO2
Email Name
MAC
TAK
BJC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page I of 2 <br />BULLDOZER WORK <br />Task description: Replacing topsoil <br />Permit Action: SO -02 Bond <br />Site: Bullger Basin Placer Calculation (2014) Permit/Job #: M1985022 <br />PROJECT IDENTIFICATION <br />Task #: 002 <br />Date: 2/24/2014 <br />User: MAC <br />State: <br />County: <br />Colorado <br />Park <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: M022 -002 <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour <br />$265.84 <br />$531.67 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />12,100 <br />1.125 <br />13,613 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: -30% <br />Average site altitude: 12,300 feet <br />Material weight: 2,550 Ibs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Software <br />Utilization % <br />Ownership Cost/Hour: <br />$78.33 <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />100 <br />Ripper op. Cost/Hour: <br />$7.96 <br />100 <br />Operator Cost/Hour: <br />$37.41 <br />NA <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour <br />$265.84 <br />$531.67 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />12,100 <br />1.125 <br />13,613 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />150 feet <br />910.5 LCY /hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: -30% <br />Average site altitude: 12,300 feet <br />Material weight: 2,550 Ibs/LCY <br />Weight description: Earth - Dry packed <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.