My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-06_PERMIT FILE - C1981008A (6)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2014-02-06_PERMIT FILE - C1981008A (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:45 PM
Creation date
5/9/2014 7:52:54 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
2/6/2014
Doc Name
SOIL RESOURCE INFORMATION
Section_Exhibit Name
Section 2.04.9 Soil Resource Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Topsoil Stripping Procedures <br />Prior to February 2008, the 1998/1999 expansion area was stripped in one mixed lift which was the <br />A and B lifts combined. The topsoil balance as of February 2008 is shown on Map 2.04.9 -2. All <br />topsoil replacement thickness are shown on the Map for the entire permit area. <br />Topsoil was salvaged from all significant disturbance areas including sediment ponds (includes <br />pond area, embankment, and spillway), mining activities, spoil stockpiles, haul roads, access <br />roads, mining area (includes box cut spoil and highwall reduction area) shop area, and diversion <br />ditches. Topsoil was removed from all cut and fill slopes. No topsoil was salvaged from the light <br />use roads utilized for environmental monitoring or power line corridors, except where cut and fills <br />are required. Prior to topsoil removal, vegetation which is too large for incorporation into the topsoil <br />was scraped away and combined with the overburden. The remaining vegetation was incorporated <br />into the topsoil to help increase soil organic matter levels. To prevent unnecessary contamination, <br />adequate extent of topsoil was salvaged from the edge of a road, embankment, ditch, cut slope, <br />and toe of fill. <br />For the original permit area, a two -lift topsoil operation was utilized for the two primary pre -mine <br />irrigated pastureland soil types (30C and D7013), whereby the "A" and upper "B" horizons (Lift A) <br />are salvaged separately from the lower "B" and "C' soil horizons (Lift B) (1988 -1996 disturbance <br />area). <br />Specific Soil Map Units (1 E, 1 EW, and 808) at New Horizon 2 (1988 -1996 disturbance area) was <br />more suited for mixed one -lift topsoil salvage because they are very shallow to shallow, have little <br />profile development, and /or are excessively stratified. The salvageable topsoil from these units <br />was primarily utilized, whenever feasible, in postmine dry pastureland area. <br />August 2013 (PR 08) 2.04.9 -21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.