Laserfiche WebLink
112c Annual Report <br />Page 2 of 3 <br />Permittee Name: <br />Van Valkenburg Cattle <br />Company, LLC <br />Permit Number: <br />M- 2005 -003 HAY 0 5 L0 <br />Operation Name: <br />Van Valkenburg Gravel Pit <br />County: <br />Jackson DIVISION OF KU A <br />Annual Fee Due: <br />$791.00 <br />Anniversary Date: <br />May 11, 2014 MINING AND SAR <br />Permit Acreage: <br />36.00 <br />Current Bond Amt: <br />$10,800.00 <br />Ifi,T IONI <br />:Ty <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). (!!Ds NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). YES ) NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling aXiLvity at the mine? / D -- I .2 o 13 <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />�Te�G�1.1oC xI re, 0'1 *6 on (Pe-e, mile ao 13 <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />YES NO <br />YES NO <br />YES NO <br />_ -3 <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled:/ <br />seeded w/ <br />a <br />w /topsoil <br />mulched w/ <br />5 <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />graded: <br />dl S <br />Total acres <br />fertilized w/ <br />(� <br />Topsoil <br />replacement <br />1 lI <br />a,�� <br />Mulch application <br />rate (tons /ac): <br />0 <br />�/Z <br />`C <br />apvd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch, <br />p� <br />application <br />+ i� p r5� <br />C <br />application <br />" IV� <br />application <br />d wd s r o a <br />method: <br />method: <br />method: <br />