Laserfiche WebLink
Rick Parsons <br />M &G SWSP <br />May 6, 2014 <br />Page 7of7 <br />15. The decision of the state engineer shall have no precedential or evidentiary force, shall <br />not create any presumptions, shift the burden of proof, or serve as a defense in any <br />pending water court case or any other legal action that may be initiated concerning this <br />plan. This decision shall not bind the state engineer to act in a similar manner in any <br />other applications involving other plans, or in any proposed renewal of this plan, and <br />shall not imply concurrence with any findings of fact or conclusions of law contained <br />herein, or with the engineering methodologies used by the Applicant. <br />Please contact loana Comaniciu in Denver at (303) 866 -3581, or Dean Santistevan in <br />Greeley at (970) 352 -8712, if you have any questions concerning this approval. <br />Sincerely, <br />jak d <br />(jJeffjD �atherage, P.E. <br />of Water Supply <br />Attachments: Tables 1a and lb <br />Platte River Farm: Fulton Ditch Shares Dedication, Dry -up Documentation <br />Fulton Water Lease (Maxine Tower), Dry -up Documentation <br />Administration Protocol `Augmentation Plan Accounting, Division One — South Platte River" <br />Cc: Dean Santistevan, Assistant State Engineer, DivlAccounting(a)-state.co.us <br />Bill Schneider, Water Commissioner District 2, William.Schneider(a)-state.co.us <br />Brent Schantz, River Operations & Compact Coordinator, Brent. Schantz(a.state.co.us <br />Colin Watson, Municipal Accounting Coordinator, Colin.Watson(a-state.co.us <br />Division of Reclamation, Mining and Safety <br />JD /JMW /idc: M &G Pit_M86079(14- 15).docx <br />