Laserfiche WebLink
flow to the perimeter ditches. No major rills or gullies were observed along the outslopes of both piles. Refuse <br />piles were stable with no signs of slumping or sloughing observed. <br /> <br />Spreading refuse on RP-5A. <br /> <br />RECLAMATION SUCCESS - Rule 4.15, Rule 3: <br />Cheatgrass was sprayed during the month of March on the topsoil pile adjacent to pond RP-1. Results appear to be <br />successful. Scott Wanstedt mentioned that experimentation with spraying combined with seeding of competitive <br /> <br /> <br />REVEGETATION Rule 4.15 <br />Vegetative Cover; Timing: <br />The reclaimed RS-6 pad and the LWB 13-1 pad has been reseeded prior to the inspection. <br /> <br />LWB-13-1. LWB 13-1. <br /> <br />SIGNS AND MARKERS Rule 4.02: <br />Topsoil and subsoil piles inspected were all clearly marked with signs of designation. <br /> <br />Mine identification sign was inspected at the entrance to the mine facility area. All information for compliance <br />was clearly listed. <br />