Laserfiche WebLink
Bowie No. 2 Mine C 1996083 Technical Revision No. 86 Page 9 of 9 <br />Totals Seed Mix 1 21.00 <br />Application <br />Description <br />Cost /Acre <br />Drill seeding DRMS Cost Data) <br />$88.20 <br />Total Seed Application Cost/Acre <br />1 $88.20 <br />MULCHING and MISCELLANEOUS <br />Materials <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Hay, delivered {MEANS 3125 14.16 12001 <br />2.00 <br />TON <br />$265.00 <br />$530.00 <br />Total Mulch Materials Cost/Acre <br />Totals Nursery Stock Cost / Acre <br />1 $0.00 <br />$530.00 <br />Annlication <br />Description <br />Cost /Acre <br />Crimping, with tractor (DMG survey data <br />$65.89 <br />Power mulcher (MEANS 32 91 13.16 0250) <br />$86.68 <br />Total Mulch Application Cost/Acre <br />$152.57 <br />NURSERY STOCK PLANTING <br />Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />Totals Nursery Stock Cost / Acre <br />1 $0.00 <br />JOB TIME AND COST <br />No. of Acres: 16.8 Cost /Acre: $1,155.12 <br />Estimated Failure Rate: 50% Cost /Acre *: $472.55 <br />*Selected Replanting Work Items: SEEDING <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />$19,406.02 <br />$3,969.42 <br />$23,375.44 <br />17.00 <br />CIRCES Cost Estimating Software <br />