Laserfiche WebLink
Bowie No. 2 Mine C1996083 Technical Revision No. 86 Page 6 of 9 <br />BULLDOZER WORK <br />Task description: Re- topsoil 10 GVB, 3 Exploration holes pads <br />Site: Bowie No. 2 Mine Permit Action: Technical Revision 86 Petmit/Job #: C1996083 <br />PROJECT IDENTIFICATION <br />Task #: 360 <br />Date: 4/7/2014 <br />User: SLB <br />State: Colorado <br />County: Delta <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />NA <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />MATERIAL QUANTITIES <br />Initial Volume: 14,447 <br />Swell factor: 1.125 <br />Loose volume: 16,253 LCY <br />Source of estimated volume: DRMS - 0.75' over 11.94 acres <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />100 feet <br />1,243.2 LCY/hr <br />Consolidated stockpile 1.0 <br />20% <br />7,725 feet <br />2,550 Ibs /LCY <br />Earth - Dry pa( <br />Abbreviation <br />Filename <br />Job Condition Correction Factor <br />Source <br />Utilization % <br />Ownership Cost/Hour: <br />$69.88 <br />AVG. <br />NA <br />Operating Cost/Hour: <br />$142.13 <br />CAT HB <br />100 <br />Ripper op. Cost/Hour: <br />$0.00 <br />(GEN.) <br />0 <br />Operator Cost/Hour: <br />$37.41 <br />(AVG.) <br />NA <br />Total unit Cost/Hour: $249.42 <br />Total Fleet Cost/Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: 14,447 <br />Swell factor: 1.125 <br />Loose volume: 16,253 LCY <br />Source of estimated volume: DRMS - 0.75' over 11.94 acres <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />100 feet <br />1,243.2 LCY/hr <br />Consolidated stockpile 1.0 <br />20% <br />7,725 feet <br />2,550 Ibs /LCY <br />Earth - Dry pa( <br />Abbreviation <br />Filename <br />Job Condition Correction Factor <br />Source <br />Operator Skill: <br />0.750 <br />AVG. <br />Material consistency: <br />1.000 <br />CAT HB <br />Dozing method: <br />1.000 <br />(GEN.) <br />Visibility: <br />1.000 <br />(AVG.) <br />None <br />C083 -360 <br />C[RCES Cost Estimating Software <br />